Laserfiche WebLink
TO POSTING ' 2 1999 <br />CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />09/17/1997 Page 1 <br />Date Range :12/03/1900 - 09/10/1997_____________________________________________ <br />CM Work Order Range :1001091070001 - UT0021-35- Pattern :7101196649380 <br />Item Range :<Blank> - WVL36941,05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101196649380 Title: SO 2 INCH 9931 19TH AVE SE <br />Item ID: -- <br />Location ID: -- <br />Program 710 Function 119 Activity 664 <br />Date Completed: 08/22/1997 <br />Overall Craft: <br />Issued: 05/23/1997 Issued by: Assigned to: <br />Out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft <br />----- <br />ID <br />------ <br />Name <br />------------------------------ <br />Planned Hrs <br />Actual Hrs <br />Cost <br />WST <br />LDS <br />LOFLING, <br />DELMAR S. <br />----------- <br />0.00 <br />---------- <br />2.00 <br />---------- <br />43.62 <br />DLII <br />RBL <br />RICHARDS, <br />BEN L. <br />0.00 <br />4.00 <br />32.00 <br />WST <br />TDE1 <br />THOMPSON, <br />DWAYNE E. <br />0.00 <br />2.00 <br />38.30 <br />WST <br />WDT <br />WALDEN, DAROLD T. <br />0.00 <br />4.00 <br />84.92 <br />UL <br />WTE <br />WESTVANG, <br />TERRY E. <br />0.00 <br />2.00 <br />31.56 <br />Materials: <br />ID <br />------------ <br />BOX000044647 <br />BOX000056147 <br />CORP38002547 <br />COUP38007347 <br />COUP38007447 <br />COUP38007447 <br />ELL038107947 <br />INSE38021047 <br />METE38137747 <br />N/A <br />NIPP38134247 <br />PIPE38060947 <br />SADD46018647 <br />SETT38033447 <br />VALV38034348 <br />Vehicles: <br />ID <br />Description <br />--------------------------- <br />BOX VALVE 5' PLASTIC <br />BOX METER PLA 17" X 30" W/LID <br />CORP STOP 2" MIP X MIP @ <br />COUPLING COMP 2" MIP X CTS @ <br />COUPLING COMP 2" FIP X CTS @ <br />COUPLING COMP 2" FIP X CTS @ <br />ELL 2" 90 DEG STREET BRASS <br />INSERT STIFFENERS 2" CTS @ <br />METER 2" NEPTUNE W/PRO READ <br />TRACING WIRE <br />NIPPLE 2" X 4" BRASS <br />PIPE 2" POLY C.T.S. <br />SERVICE SADDLE 8" W/2" IP DBL <br />SETTER COP 2" (H1211) <br />VALVE GATE 2" SUPER HEAVY DUTY <br />Description <br />------------------------------ <br />Total Labor Cost: 230.40 <br />Date # Used Cost <br />08/22/1997 1 33.19 <br />08/22/1997 1 70.78 <br />08/22/1997 1 55.23 <br />08/22/1997 3 76.17 <br />08/22/1997 1 20.00 <br />08/22/1997 1 20.00 <br />08/22/1997 1 9.56 <br />08/22/1997 4 3.80 <br />08 22 1997 1 429.32 <br />08 22 1.10- <br />08/22/1997 1 5.3 <br />08/22/1997 10 9.30 <br />08/22/1997 1 25.22 <br />08/22/1997 1 270.33 <br />08/22/1997 1 96.48 <br />Total Material Cost: 1125.78 <br />11 <br />Hours Cost I I��,(o$ <br />---------------- <br />