Laserfiche WebLink
TABLE OF CONTENTS <br />M <br />1.0 GENERAL INFORMATION............................................1 <br />2.0 STORMWATER QUANTITY CONTROL ................................... 1 <br />2.1 DELINEATION OF DRAINAGE BASIN .................... ........... 1 <br />2.2 RUNOFF CURVE NUMBERS ...................................... 2 <br />2.3 TIME OF CONCENTRATION ...................................... 2 <br />2.4 SOILS.......................................................2 <br />2.5 DETENTION VOLUME CALCULATIONS .............................. 2 <br />3.0 STORMWATER QUALITY CONTROL....................................2 <br />4.0 CONVEYANCE....................................................3 <br />FIGURES <br />FIGURE 1: VICINITY MAP <br />FIGURE 2: PRE -DEVELOPMENT CONDITIONS MAP <br />FIGURE 3: POST -DEVELOPMENT CONDITIONS MAP <br />FIGURE 4: SOILS MAP <br />APPENDIX "A": HYDROLOGY COMPUTATIONS <br />APPENDIX "B": PIPE CONVEYANCE AND BIOFILTRATION CALCULATIONS <br />