Laserfiche WebLink
PUBLIC WORK <br />Item Unit Quantitv Unit Price Amour <br />PAVING <br />AC Pavement Patching <br />(includes removal S.Y. 9.00 <br />of old oavement <br />�4" crushed rock, <br />S.Y. <br />4.00 <br />6" crushed rock, <br />S.Y. <br />6.00 <br />2" Class B <br />S.Y. <br />4.00 <br />A 3" Class B <br />S.Y. <br />6.00 <br />4" Class B <br />S.Y. <br />8.00 <br />Bank Run Gravel, 3" - <br />(scraened) in place <br />C.Y. <br />7.50 <br />5/8" - crushed rock, <br />in place C.Y. M.00 <br />Saw Cut AC pavement Ft. 2.00 <br />Other <br />PAVING TOTAL <br />CURB AND GUTTER <br />Curb & Gutter <br />Other <br />LF 07 <br />CURB AND GUTTER TOTAL <br />6.50 <br />$ J 7."..0 <br />