My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10523 19TH PL W 2016-01-01 MF Import
>
Address Records
>
19TH PL W
>
10523
>
10523 19TH PL W 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 8:31:55 AM
Creation date
4/2/2017 3:22:15 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH PL W
Street Number
10523
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WOReCS PERMIT COMMENTS <br />4. Connect side sewer per City Standard #601. <br />5. Connect side sewer per City Standard #'s u01, 602, G04. <br />6. Connect all rooftop downspouts to the side sewer. <br />10 <br />Connect rooitop downspouts to the drainage system provided for ihis lot. <br />Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br />Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See attachment for <br />more defails. <br />The contractor must meet with the Public Works Inspeclor to discuss potential drainage routing prior to <br />beginning the project. <br />Ir.stall erosion control measures as delermined by lhe Public V�orks inspector, such as sill fence, straw <br />bales, swales, or erosion blankels. <br />Install erosion control measures per Ciry of Everett Slandards for small parcels <br />Remove erosion conlrol measures upon completion of the project prior to final approval of the permit. <br />� 13.:: All excavated malerial from foundation, sidewalk and driveways shall be hauled to an approved, <br />'�� permitted sile. No wasting of material is allowed on this building lot. <br />�T <br />/ '� <br />((�g. ! <br />16. <br />17. <br />1 S. <br />19. <br />20. <br />21. <br />22. <br />23. <br />No dirt, mud, rocks or debris to be tracked onlo roadway. <br />No building materials to be stacked on sidewalks and sidewalks to be kept clean and open for <br />pedestrian travel. <br />P.djust water meter box 1" above sidewalk grade. <br />Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A & 306 on <br />�his proposal's frontage as directed by the Public Works Inspector (i.e. all unused driveways and any <br />broken or damaged area must be replaced). <br />Install a Type I concrete driveway per City of Everett Slandard #307. <br />Pave driveway fror,� the front property line out lo lhe street paving. <br />Contacl the /;'�/�"'/,ii c_�< Waler District for connecting provisions for lhis building's water and <br />se�ver services. <br />A catch basin as per City Standard Plan :t402 with a gas trap per Standard Plan #410 is required for ihe <br />parkirg area. <br />If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, then <br />gravity ilow across the public righl-of-way. <br />A sprinkler system �s required for this building in compliance with the requirements of NFDA Standards <br />13D. <br />FOR PUBLIC WORf<S INSPECTION, CALL RANDY AT 425339-7403 / CLIFF AT 425-339-7404 <br />P1VComnients <br />Z I� <br />
The URL can be used to link to this page
Your browser does not support the video tag.