My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1909 19TH ST 2016-01-01 MF Import
>
Address Records
>
19TH ST
>
1909
>
1909 19TH ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 8:42:56 PM
Creation date
4/2/2017 3:25:04 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH ST
Street Number
1909
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CI.OS1dD C![ WORR ORDERS REPORT <br />Total Utility Maintenance Management System page 2 <br />O1/02/1998 <br />Date Ranqe :O1/09/1989 - 01/O1/1998 <br />CM Work Order Range :0810800810000 - UT2830-30-32zPattern :*101096750344 <br />Item Range :<Blank> - WVL3694L05 <br />Program l,LI. Function ALL Activity ALL _________________`__ <br />CM WORK ORDER ID: 7101096750344 (continued) <br />WYE044303947 WYE 6" ALL GASKETED <br />WYE044307047 WYE 6" X 4" ALL GASKETED <br />Vehicles: <br />ID <br />V0010 <br />V2064 <br />V2086 <br />V2113 <br />V2152 <br />V2663 <br />V3603 <br />V6807 <br />VJ0002 <br />VJ0004 <br />Description <br />'92 GMC S10 PU <br />1978 GMC 3/4 TOI1� PICKUP <br />91 DODGE PU 1/2 7.'ON <br />91 CHEV 1-TON <br />87 DODGE W/HOIST <br />87 VACTOR <br />86 CASE BACKHOE <br />89 COMPRESSOR IR <br />93 INTERNATIONAL <br />'95 CHEV 1-TON <br />780 <br />10 YD <br />12/16/1997 <br />12/16/1997 <br />Total Material Cost: <br />Hours <br />3.00 <br />1.G0 <br />4.00 <br />3.00 <br />8.00 <br />3.00 <br />20.00 <br />8.00 <br />19.00 <br />8.00 <br />Cost <br />16.20 <br />4.56 <br />21.20 <br />15.90 <br />38.40 <br />143.10 <br />792.00 <br />38.40 <br />406.60 <br />47.20 <br />9.99 <br />8.82 <br />232.99 <br />Total Vehicle Cost: 1523.56 <br />Work Description: <br />------------------------------------------------------------------- <br />REPLACED 6' OF MAIN. REPI,ACED SIDE SEWER FOR 1909 TO SIDE OF DITCH. NEGr <br />STATIONING IS 68'. REPLFCE SIDE SEWER FOR 1917 19TIi FROM MAIN TO RROPEI2TY <br />LINE. NEW STATIONING IS 70'. B�TH SIDE SEWERS ARE 5� DEEP AT CONNECTIONS <br />MAIN IS 8' DEEP. <br />Total cost for work order 7101096750344: 3105.54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.