Laserfiche WebLink
CLOSED CM WORR ORDEFtS REPORT <br />Total Utility Maintenance Manaqement SVstem <br />12/03/1996 Pa4e 1 <br />--------------------------------=---=____= ________=________=_�_____----- <br />Date Ranqe :O1/09/1989 - il/27/1996 <br />CM Work Order Ranqe :i001091070001 - UT2600-02- Pattern :7101096730013 <br />Item Ranq_e :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL ActivitV ALL <br />------------------------------____=_______ =___=___= _ � =___=_==_____ <br />CM WORK ORDER ID: 7101096730013 Title: REPAIR 2011 - 19TH STREET <br />«DUPLICATE 'r.':lINTING OF THIS WORK ORDER» ' <br />Item ID: SML1795W12 -- SEWER MAIN <br />Location ID: -- <br />Proqram 710 Function 109 Activity 673 <br />Date Completed: 11/14/1996 <br />Overall Craft: <br />Issued: 11/12/1996 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: o hours <br />Status: HN <br />Labor: <br />Craft ID <br />SUP1 AGA <br />HEO MCC <br />UL MHA <br />HEO SDD <br />Materials: <br />ID <br />CEME00061438 <br />COUP46300547 <br />ELL044303347 <br />ELL044303447 <br />ELL044303547 <br />PIPE44304247 <br />PIPE46304347 <br />TEE046304047 <br />Vehicles: <br />ID <br />V0010 <br />V3603 <br />VJ0002 <br />Issued by: HDA Assiqned to: AGA <br />Priority: Travel Time: 0.00 Hr. <br />Name Planned Hrs Actual Hrs <br />- ---------------------------- ----------- ---------- <br />AHLES, GREGORY A. 0.00 2.00 <br />MAGEE, CARL C. 0.00 14.00 <br />MAROON, HERBERT ARTHUR 0.00 14.00 <br />STECHER, DANIEL D. 0.00 14.00 <br />Total Labor Cost: <br />Description <br />------------------------------ <br />CEMENT 20 MIN. SET 50 LB. BAG <br />COUPLING 8° CLA3 X S" Cl/PL <br />ELL 6" 45 DEG ALL GASKETED <br />ELL 6" 45 DEG SP X GASKETED <br />ELL 6" 22 1/2 DEG ALL GASKETED <br />PIPE 6" PVC SEWER <br />PIPE 8" PVC SEWER <br />TEE S" X 6" ALL GASKETED <br />Description <br />'92 GMC S10 PU <br />86 CASE BACKHOE 780 <br />93 INTERNATIONAL 10 YD <br />Date <br />11/14/1996 <br />11/14/1996 <br />11%15/1996 <br />11/15/1996 <br />11/15/1996 <br />11/15/1996 <br />11/14/1996 <br />11/14/1996 <br /># Used <br />2 <br />1 <br />1 <br />2 <br />1 <br />10 <br />3 <br />1 <br />Total *laterial Cost: <br />Hours <br />2.00 <br />14.00 <br />14.00 <br />Total Vehicle Cost: <br />Cost <br />11.40 <br />592.20 <br />316.40 <br />920.00 <br />Cost <br />43.82 <br />278.88 <br />182.98 <br />276.92 <br />782.60 <br />Cost <br />23.72 <br />10.41 <br />4.97 <br />9.48 <br />5.18 <br />12.80 <br />6.54 <br />•14.64 <br />--87.74 <br />