Laserfiche WebLink
ADDENDUM TO FHA COMMITMENT FHA CASE NO.--t/-,26599 <br />SHEET _OF ADDRESS 3U L 57- <br />DATE 2- 0.1&u <br />Specific commitment conditions (applicable when checked) <br />Note: All required repairs must be completed in a professional manner. <br />or test control certificates <br />this certificate be obtained before any otner certifications are ootainea ant any repair <br />work commenced. <br />VC-11 L7 If property is sold under Section 221(d)(2) a certificate of'compliance with the <br />minimum housing code will be required prior to reaueet for inspection of other addendum <br />requirements. If there are no addendum requirenents, the certificate may be submitted <br />with closing documents. <br />VC-12 / / Submit certification from the local authority having jurisdiction that the subject <br />property is in compliance with the Local Minimum Housing Code. <br />VC-13 / / Submit certification from a state licensed pest control operator'that wood destroying <br />organisms, fungus and/or rot damage in all of the dwelling, interior and exterior, have <br />been eliminated. Attach list of any repairs or corrections completed in connection <br />with above certification. A "Standard Notice of:Work Completed" or A report form <br />indicating no infestation may be submitted as certification. Note: A11'repairs 1_5;t <br />be completed in a professional manner and in compliance with local building codes. <br />VC-14 / / / / (a) This commitment is subject to receipt of clear certificate(s) for (electrical, <br />plumbing, roofing, and heating). The required certificate(d) is (are) being ordered <br />and will be paid for by HUD. Cost of additional certificates or',required repairs shall <br />be borne by the Seller. <br />/ / (b) Reinspection to examine the following system(s) not in operation at the time <br />of our appraisal is required. Please notify this office in writing when ready for <br />inspection: <br />_/_/ plumbing / / heating / / electrical <br />Correction of any deficiencies found is a specific condition of this commitment. <br />Indicated system(s) shall be operable and inspection completed prior.to the request <br />for conversion to a firm commitment. <br />VC-15 / / / / (a) Furnish evidence from the local health authority indicating approval of the <br />individual water supply system, / / individual sewage disposal system.` <br />(b) Furnish written evidence from she S ite Department of Ecology showing. that the <br />water rights claim for the well serving C ubject property had been filed. <br />VC-16 / / Reserved <br />VC-17 / / / % (a) re -roof / / repair roof of / / dwelling and/or / / garage with minimum 23,5fi <br />self sealing composition shingles or #1 cedar shingles, and repair sheathing and <br />install new flashings as necessary. Remove all old roofing when two or more layers <br />exist. <br />/ / (b) Repair built-up roof: Remove all gravel and counter flashing from roof, clean <br />surface to accept hot mop. Provide minimum 15 lb. felt, hot mopped and flood coated. <br />Replace gravel and flashing and properly seal all gutters and apertures. <br />(c) Re -roof: After removing all old roofing, install min. 3-15# felts and 400# <br />gravel: <br />VC-18 / / Paint all exterior metal and wnod trim of / / house and/or / / garage after adequately <br />preparing surface. <br />VC-19 / / Paint entire exterior of / / house andror / / garage including trim. Prepare surface <br />by repairing damaged'areas, remove all loose paint and blisters and apply an undercoat <br />to all bare wood. <br />VC-20 / / Remove the existing floor covering in the following rooms: _ <br />Replace with new resilient floor covering over suitable underlayment after making <br />necessary repairs to subfloor. Carpeting net acceptable in kitchen and bath areas. <br />TUMBLE <br />- -- - - --_ - - = - _ —�T - - - - <br />