Laserfiche WebLink
.lA�l 1 U 1aV7 <br />e� P�STIN�-- <br />CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Mar.•agement System <br />10/O1/1996 Page 1 <br />------------------------------___-______________________________________________ <br />Date Range c01/09/1989 - 09/26/1996 <br />CM Work Orier Range :1001091070001 - UT2600-02- Pattern :7101196649025 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />------------------------------------------__--__________________________________-_ <br />CM WORK ORDER ID: 7101196649025 Title: SO .75 INCH 1709 20TH ST <br />Item ID: -- <br />Location ID: -- <br />Program 710 Function 119 Activity 664 <br />Date Completeci: 08/29/1996 <br />Overall Craft: <br />Zssued: 07/19/1996 <br />Out of Service' NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />UL CSG <br />WST WDT <br />llaterials : <br />ID <br />ADAP34000547 <br />ADAP34000647 <br />BOX000056247 <br />CORP36002347 <br />COUP36143547 <br />ELL034104247 <br />METE36089447 <br />N!A <br />N/A <br />PIPE34060647 <br />SETT34033647 <br />Issued by: Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name <br />----------------- <br />CAVANAH, SHANE G. <br />47ALDEN, DAROLU T. <br />Description <br />------------------------------ <br />ADAPTER 3/4" MIP X INSTA-:•ITE@ <br />ADAPTER 3/4° �P �NSTA-TITE@ <br />BOX METER PLA 15" X 10" W/LID <br />CORP STOP 1" CCT X COP @ <br />Ct;UPLING 1" CTN X 3/4° MIP @ <br />ELL 3/4" 90 DEG STREET BRASS ^ <br />METER 5/8" X 3/4" NEPTUNE T-10 <br />TRACING WIRE (STOCK) <br />12" STL X 1" IP SADDLE (STOCK) <br />PIPE 3/4" POLY I.P.S. <br />SETTER COP 5/8" X 3/4" (H12.") <br />Vehicles: <br />ID__________ Description <br />----------------- <br />V211? 91 CHEV 1-TON HYD <br />VH0�03 94 CAT BACKHOE <br />Work Description: <br />------------------------------- <br />UNIT <br />Planned Hrs Actual Hrs Cost <br />0.00 8.00 <br />0.00 8.00 <br />Total Labor Cost: <br />Date <br />08/21/1996 <br />OS/21/1996 <br />08/21/1996 <br />08/21/1996 <br />08/21/1996 <br />08/21/1996 <br />08/21/1996 <br />08/21/1996 <br />OS/21/1996 <br />08/21/1996 <br />08/21/1996 <br />104.56 <br />163.60 <br />268.16 <br /># Used Cost <br />1 7.68 <br />1 7.16 <br />1 12.90 <br />1 12.66 <br />1 5.76 <br />1 1.76 <br />1 30.67 <br />10�— 11.00 <br />1 O.OU <br />100 24.00 <br />1 52.61 <br />Total Material Cost: <br />Hours <br />8.00 <br />8.00 <br />Cost <br />44.80 <br />223.20 <br />T�tal Vehicle Cost: 268.00 <br />166.20 <br />� Il.00 <br />/SS,�O <br />