Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #`601. <br />6. Connect side sewer per City Standard #'s 601, 602, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />� Connect rooftop downspouts to the drainage system provided for this lot. <br />l./ <br />9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _. <br />10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />�Instali erosion contrul measure�, as determined by the Public Works inspector, such as silt <br />fence, straw bales, swales, or arosion blankets. <br />12. Install erosion control measures per City of Everett Standards for small parcels <br />13. Remove erosion control measures upon completion of the project prior to final approvai of the <br />permit. <br />14 All excavated material from foundation, sidewalk and driveways shall be hauled to an <br />approved, permitted site. No wasting of mate, ial is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan „'s 305A <br />& 306 on this proposal's frontage as directed by the Pubiic Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. Install a Type I concrete driveway per City of Everett Standard #307. <br />17. Pave driveway from the front property line out to the street paving. <br />�Contact the ���� Water District for connecting provisions for this building's <br />water and sewer services. <br />19. A catch basin as per City Standard Plan #402 with a gas trap per S;andard Plan #410 is <br />required for the parking area. <br />20. If a sewer pump .ystem is to be installed, the pressure line must discharge into a private <br />manhole, then gravity tlow across the public right-of-way. <br />21. A sprinkler system is required for this building in compliance with the reGuirements of NFDA <br />Standards 13D. <br />PWCommenis �7��)/ <br />U <br />