Laserfiche WebLink
PUBLIC WORKS PERMIT <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425)-257-8810 <br />Date: 6/1 /2009 <br />Public Works Permit #: PWO906-001 <br />Buildinq Permit #: B0905-045 <br />Planninq Reference #: <br />Public Works Fee $: $ 25.00 <br />nthPr a <br />OWNER NAME AND ADDRESS: 1 IhDG, APPLICANT NAME AND ADDRESS: <br />TAYLOR DEBORAH & LARRY i p4Il�E $25.00 <br />3010 21 ST ST o�r,00S <br />EVERETT WA 98201 1 SEIJE" "71'"i <br />PHONE: 4258702053PHONE: <br />TAX PARCEL ID # 00553101300500 SITE ADDRESS: 3010 21 ST ST <br />DESCRIPTION OF PROPOSED WORK: <br />NEW GARAGE/ACCESSORY BUILDING <br />'20' HEIGH PER REV II <br />ACCESSORY BLDG COVENANT RECORDED (AFN#200905280224 <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br />CALL INSPECTOR, RANDY ALLEN. AT 425-339-7403 PRIOR TO STARTING CONSTRUCTION <br />4. Connect all rooftop downspouts to the side sewer. <br />5. The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to beginning <br />the project. <br />6. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw bales, <br />swales, or erosion blankets. <br />7. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br />8. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, permitted site. <br />No wasting of material is allowed on this building lot. <br />9. No dirt, mud, rocks or debris to be tracked onto roadway. <br />10 Pave driveway from the property line out to the alley paving <br />11. May need to update side sewer pipe under replacement garage to ABS pipe, PVC Plumbing Schedule 40 or <br />cast iron. <br />TO POS,Ttgo + 9 ^ 7 <br />"S�Apraoronstr 'o Date <br />F NAL INSPDate <br />Approved as Constructed _ <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicent hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement <br />or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace <br />public property damaged thereby. <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMR MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CRY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />