Laserfiche WebLink
March 5, 1979 <br />Lawrence Nalbach <br />2132 Highland <br />Everett, WA 98201 <br />RE: 3215 A-B 21st. St. <br />Subject: Information needed to process Right-of-way Use Permit 11 72L19 <br />Dear Applicant: <br />To complete the review of your application for a Fight -of -Way Use Permit, it <br />has been determined that the items marked below are required to eypedite the <br />processing of your application: <br />Signature required on application, enclosed <br />Additional information on project as noted below <br />copies of drawings or site plans <br />Required improvements at this time include: <br />A-1 Curb & Gutter with Integral S_jdewalk <br />on 21st and Transitinn Pad at QQEDer <br />QRevised drawing, showing required improvement <br />Proof of ownership __. Declaration�Gnclosed__. <br />o Authorized deed for feet of right-of-way, fronting the development, <br />be deeded to the City of Everett, deed form enclosed <br />0 Local Improvement District notarized Covenant Power-of-Attorne enclosed <br />Q Performance bond, cash deposit, or equivalent guarantee for 12E.. of the <br />estimated improvement cost or 120% of an acceptable, written bid by a <br />licensed and bonded contractor. <br />City OrdinancE: 1.=555-78 is enclosed for your reference. Please mai.:. or hand - <br />carry this information to the City of Everett Engineering Deparb.:..t, 2nd Floor, <br />3200 Cedar St. If we can provideadditional information, or if you have any <br />questions regarding the above requirements, please contact Lon Mayberry at <br />259-8511. <br />Sincerely, <br />LLOYD E. HENNING, P.E. <br />City Engineer <br />By: Celia I. St,Ong_. <br />Public Service Engineer <br />LM:is <br />Enclosure <br />cc: Larry Ca11a'-:a stijcrv.i..,;or, Buildi <br />