Laserfiche WebLink
March 5, 1979 <br />Lawrence Nalbach <br />2132 Highland <br />Everett, WA 98201 <br />RE: 3215 A-B 21st. St. <br />Subject: Information needed to process Right-of-way Use Permit n"_79 19 <br />Dear Applicant: <br />To complete the review of your application for a Right-of-way Use Permit, it <br />has been determined that the items marked below are required to expedite the <br />processing of your application: <br />Signature required on application, enclosed <br />Additional information on project as noted below <br />copies of drawings or site plans <br />Required improvements at this time include: <br />A -I Curb & Cutter with ,ld.m,alk <br />-14 <br />on 21st and Transition Pad at Corner <br />Revised drawing, shoring required improvement <br />Proof of ownership __. De(laration�Enclosed <br />Authorized deed for feet of right-of-way, fronting the development, <br />be deeded to the City of Everett, deed form enclosed <br />© Local Improvement District notarized Covenant Power-of-Attornc enclosed <br />O Performance bond, cash deposit, or equivalent guarantee for 12r . of the <br />estimated improvement cost or 120% of an acceptable, written bid by a <br />licensed and bonded contractor. <br />City Ordinance: ;'555-78 is enclosed for your reference. Please mai.'• or hand - <br />carry this information to the City of Everett Engineering DepartL:..t, 2nd Floor, <br />3200 Cedar St. If we can provide additional information, or if you have any <br />questions regarding the above requirements, please contact Lon Mayberry at <br />259-8811. <br />Sincerely, <br />LLOYD E. HENNING, P.E. <br />City Engineer <br />'/CC'..!1 <br />By: Celia I. Str0nQ <br />Public service Engineer <br />Ld7 : i s <br />Enclosure <br />/—cc: Larry C'Eilla'.:an, <br />