Laserfiche WebLink
COMPLIANCE • • • <br /> REQUIRED � � � � � ' ' e � <br /> INSPECTION �MpORTANT:Su 1 Informatlon In the shaded area by checking the approprlate circles. <br /> APPpOVED PP Y <br /> r✓I Dlsregard toplcs that don't describe your building or equipment.DO N07 p�ace checks In <br /> �J the two left columns. <br /> • ,r . N . <br /> ❑ ❑ O Sleb Insulatlon {Ta6ie 5-1, 6•1) shall be R•10 and iocated on the: <br /> fpA. Exterior (See INSt1LATiONJNSPECTiDN). <br /> OR <br /> Co.7ntedor extending dowrnvard from the top slab surtace to Its undersurtace and' <br /> horizontalty under the slab}or a total distance ot 24", or verticalty 24". <br /> ❑ ❑ ? Radiant Slab Insulailon (S.502.1.4.9) shali be R-tp and extend under the'entire slab` <br /> ❑ ❑ 8 Below yrade masonry wail insutation(S.502.1.4.10)<shali be full-depth and locatecJ on the: <br /> �4• EMerlor and rated R-10 (See INSULATION PHASE). ' <br /> OH <br /> �• IRterior (See INSULATION PHASE) ` <br /> ❑ ❑ Q Thertnal break{s) shall ba piaced i��the s�ab (S.502,t:4.8,201:1: BUILDING ENVELOPE} <br /> between ihe conditioned and unconditioned spaces chocked below, and extend from the top of the <br /> slab to the;bottom, than undemeath toward the conditfoned spsce tor a 24•. <br /> �dwelling/garage �dwelling/connected space Q slab edge and foundati�n wali. <br /> ❑ ❑ 5 Redon Requirements(VIAQ,S.502.1.2,Sp2,1,31 shall be met if nIIe of the(ollowing is checked: <br /> A, Net toundation ventiiation area is less than 1 FT2 per 300 Ft2 of crawl space <br /> Q B. Foundation vents are closable. <br /> Q C. Crawl space a.cts as a supply,or re!um air plenum. <br /> WSEC Foundation phase requirements: <br /> Inspected by: Date <br /> . , , <br /> ❑ ❑ � Insulatlon baffles shall be olaced in 2ttics/ceilings!o maintain at least 1"ventilation space and extend at <br /> least 6"verticaily above batts or 12"vertically above loosefill insulation (S. 502.1.4.5). <br /> � ❑ QGlazing ettictency requfred under the selected option shall 6e (S. 502.1:5, 602.8.2): <br /> �s U.70 (Option I) :�5 U.65 (Options Ii, tV) Os U.75 {Option 111 ) <br /> �s U.60(Opilon V) �s U.50 {Optlon Vq �s U.45 (Option VII) <br /> _.._ <br /> ° Symbols used: _eyue�s >ercarer rnan ��ass rnen ' <br /> '� a greater thennrequal s lesa thanorequel �' <br /> UPDATED MAY 30,19L7 <br /> Page 2 of 6 <br />