Laserfiche WebLink
CLOSED CM AORR ORDERS REPORT <br /> Total Utility Maintenance Management System <br /> 03/26/1997 Page 1 <br /> -------------------------_____________________________=_______________________ <br /> Date Range : O1/09/1989 - 03/21/1997 <br /> CM Work Order Range : 10010910�0001 - 7401196770910Pattern :71011967501��0 <br /> Item Range :<Blank> - WVL3694L05 Pattern : * <br /> Program ALL Function ALL Activity ALL <br /> _________________________________________________=--------•---____=___________= I <br /> CM WORK ORDER ID: 7101196750150 Title: REPAIR 5029 lOTH PL W <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: -- <br /> Location ID: -- <br /> Program 710 FUnction 119 Activity 675 <br /> Date Completed: 03/OS/1997 <br />�i Overall Craft: <br /> Issued: 02/28/1997 Issued by: WMW Assigned to: <br /> Out of Service? NO Priority: Travel Time: 0. 00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: <br /> i <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------• ------------------------------ ----------- ---------- ---------- <br /> UL C5G CA7ANAH, SHAN�E G. 0. 00 4 .00 53 .92 <br /> WST TDE1 THOMPSON, GWAYNE E.. 0. 00 3 . OG 57.45 <br /> Total Labor Cost: 111 37 <br /> Materials: <br /> ID Description Date tt Used Cost <br /> ------------ ---------/-11------------------ --/--/-- -------- ---------- �, <br /> ADAP34000347 ADAPTER 3/4 CST X INSTA-TITE@ 03/O5/1997 1 7.93 i <br /> ADAP34000547 ADAPTER 3 4 �fIP X INSTA-TITE@ 03 05 1997 2 ].6.68 <br /> ADAP34000647 ADAPT�,R 3/4" FIP X INS`PA-TITE@ 03/05/1997 1 7 .41 <br /> BOX000056247 BOX METER YLA 15" X 10" WjLID 03/04/1997 1 12.E9 <br /> COUP34004047 COUPLING 3/4" 1/8 BEND COPPER@ 03/05/1997 1 6.74 <br /> COUP34004447 COUPLING 3/4" MIP X COP @ 03/05/1997 1 3 .59 <br /> PIPE340606�7 PIPE 3/4" POLY I.P.S. 03/05/1997 4 0.92 <br /> SETT34149747 SETTER COP 5/8" X 3/4" (H7") 03/OS/1597 1 38.53 <br /> Total Material Cost: 4 .69 <br /> Vehicles: <br /> ID Description Hours Cost <br /> ------------ -------------------------•----- ------ ----------- <br /> V2146 87 CHEV 1 TON W/HYD. liNIT 4 . 00 19. 20 <br /> VH0003 94 CAT BACKHOE 3 . 00 72 . 60 <br /> Total Vehicle Cost: 91 80 <br /> II <br /> Total cost for work order 7101196750150: 297.86 ; <br />