My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/10/15 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/10/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 8:34:34 AM
Creation date
4/3/2017 8:33:30 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/15/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: -� ' <br /> An ordinance creating a special Consent COUNCIL BILL# eg 10 <br /> improvement project entitled Action Originating Department Engineering <br /> "SR99/Evergreen Way BRT 10/15/08 First Reading Contact Person Ryan Sass <br /> Project," Fund 303, Program 10/21/08 Second Reading Phone Number (425) 257-8942 <br /> 081, to accumulate all costs for 10/29/08 Third Reading FOR AGENDA OF Oct. 15, 2008 <br /> the improvement project. Public Hearing <br /> Initialed by: , <br /> Department Head <br /> CAA 'air <br /> Council President , A <br /> Location Preceding Action Attachments Department(s) Approval <br /> SR 99/Evergreen Way 10/08/08 Budget Ordinance Transit <br /> corridor(Airport Road to Committee <br /> Pacific Ave. and the <br /> Multi Modal Station) <br /> Amount Budgeted $2,170,000.00 <br /> Expenditure Required $2,170,000.00 Account Number(s): PW3360 <br /> Budget Remaining - 0 - <br /> Additional Required - 0 - <br /> DETAILED SUMMARY STATEMENT: <br /> This ordinance will create a special fund to accumulate all costs for the design and construction of transit <br /> signal priority improvements along the SR99/Evergreen Way corridor(Airport Rd to Pacific Ave and the <br /> Everett Station) in support of the Bus Rapid Transit(BRT)route in Everett. <br /> This project will install traffic signal equipment, traffic signal control equipment, central control software, <br /> traffic cameras, transit signal priority transponders, and transit signal priority tag readers. This project <br /> also includes the design and installation of fiber-optic communications cables for the signal enhancements <br /> between Everett Station and 41st Street. <br /> The funding sources for this bulb replacement project are: <br /> CMAQ—Federal Grant $ 1,160,000.00 <br /> Fund 119—Street Improvements 10,000.00 <br /> Fund 157—Traffic Mitigation. 600,000.00 <br /> Fund 425 —Everett Transit 400,000.00 <br /> Total $ 2,170,000.00 <br /> RECOMMENDATION (Exact action requested of Council): <br /> Approve the proposed ordinance creating a special improvement project entitled"SR99/Evergreen Way <br /> BRT Project," Fund 303, Program 081, to accumulate all costs for the improvement project. <br /> 1_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.