My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/10/15 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/10/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 8:34:34 AM
Creation date
4/3/2017 8:33:30 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/15/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT FISCAL ANNEXATION ANALYSIS <br /> Parks <br /> The City's Parks Department is responsible for maintenance of the City's 463 acres of parks, as well as <br /> recreation programs and community facilities. With annexation under Scenarios 3 and 4, the City <br /> would add only three acres of active park space, which does not cause a need for additional <br /> maintenance staff. However, Scenario 3 is estimated to require an additional 1.0 FTE for the increase <br /> in use of recreation programs, with 0.5 each for a Recreation Program Coordinator and a Recreation <br /> Coordinator, bringing total staff from 58 FTEs to 59. For Scenario 4, the City is estimated to need an <br /> additional 3.5 FTEs. Adding to the FTEs in Scenario 3 is 0.5 each for a Building Caretaker, Electrician, <br /> Recreation Activity Leader, Office Assistant, and Administrative Assistant for a total of 61.5 FTEs. The <br /> City is currently authorized 60 FTEs. <br /> Library <br /> The City's library system has two locations to serve residents and approximately 47.5 FTEs. The main <br /> branch has 53,000 square feet and runs a bookmobile service with two vehicles. The second branch <br /> has 8,500 square feet. Library staff feel the current locations are short on computers to serve the <br /> existing population, and the meeting rooms available for public use are regularly full. Approximately <br /> 33,000 City residents actively used their library cards in 2007. <br /> For Scenarios 3 and 4, the City has proposed adding materials to the existing branches to serve the <br /> needs of the increased population. This would require an initial investment of an estimated $100,000 <br /> for Scenario 3 and $200,000 for Scenario 4. It is important to note that even though additional facility <br /> space or staff were not estimated for these scenarios, in reality, the existing facilities are already over <br /> capacity and may need to be expanded. However, it is difficult to estimate whether there will be a <br /> significant increase in new patrons for existing facilities or residents will find it more convenient to <br /> continue using library services closest to their homes. <br /> For more discussion on library services, see Section 7.2 of this report. <br /> Streets <br /> The City's Streets Department works to maintain and preserve the City's sidewalks, streets, and right- <br /> of-way structures.The Department currently has 31.5 FTEs. <br /> With annexation under Scenario 3, the City would add 33.6 lane miles of road to the existing 314 <br /> lane miles, an increase of 11%. This is expected to require an added 4 FTEs for a total of 35.5. The <br /> added positions are 1.0 FTE for Supervisor I, 0.5 FTE for a Heavy Equipment Operator, 1.0 FTE for an <br /> Equipment Operator, 0.5 FTE for a Cement Finisher, and 1.0 FTE for a Utility Laborer. <br /> Annexation under Scenario 4 would add 65.9 lane miles to the City, an increase of 21%. In addition <br /> to the 4 FTEs needed under Scenario 3, Scenario 4 would require an added 3.5 FTEs in the following <br /> positions: 1.0 FTE for a Maintenance and Operations Supervisor, 1.0 FTE for a Supervisor II, 0.5 for an <br /> Equipment Operator (for a total 1.5 added in this position), 0.5 for a Cement Finisher (for a total 1.0 <br /> FTE added in this position), and 0.5 for a Utility Laborer (for a total 1.5 FTEs added in this position). <br /> SII Final Report:October 2008 Page 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.