Laserfiche WebLink
• Moved sewer line closer to north buiiding. <br /> • Revised Nates 2, 13. <br /> • Added Constmction Notes 35 to 43 <br /> • Added 2"irrigation meAer on Pine. <br /> • Added TV cable along north prop. line. <br /> • Check valve assemblies are located u�side building, mechanical designer working with Water <br /> Dept. <br /> • Added 12 -14 ai General Notes. <br /> Sheet C1.03 <br /> • Arsenic and lead were tested for solubility and determined not to exceed DOE standards(see <br /> HASP). <br /> e Construction site wiil be fenced see sheet C 1.05. <br /> • 'Ihe clearing limits will be defined during each phase of construction. <br /> • Adc�eA nates 6 thru ]0. <br /> • Added silt fence on west side of property,north side of North building,along south side temp. <br /> parking. <br /> • Addeci wheel wash area. <br /> • Addecl culvert under temp. entrance. <br /> Sheet C1.04 <br /> • Added notes 3 thru 9. <br /> Sheet C 1.OS II <br /> • Changed notes 15,16, 25,and 29. <br /> • Notes 35 and 36 are from sheet C 1.07,Notes 47, 48. <br /> • Added notes 37-08. <br /> • Changed Replacement Parking area per City of Everett, Mental Health Building Managers. <br /> Sheet C1.06 <br /> • Loading dock trench drain outlet was revised on sheet C 1.07 <br /> • Added Notes 2-7 <br /> • Added more spot elevations. <br /> Sheec C1.07 <br /> • Added notes 49-59. <br /> • Added CB It24 <br /> • Added Gravel Trench Drain <br />