My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/11/10 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/11/10 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 9:31:42 AM
Creation date
4/3/2017 9:31:17 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/10/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> INTRODUCTION <br /> This project is an essential component of the Swift Bus Rapid Transit (BRT) project being <br /> developed by Community Transit. Swift will run approximately 16.7 miles along the <br /> SR99/Evergreen Way/Rucker Avenue corridor from the Aurora Village Transit Center in <br /> King County to Everett Station. It will ultimately interconnect with King County Metro <br /> Transit's RapidRide project that will provide bus rapid transit service on SR99 from the <br /> Seattle CBD to Aurora Village Transit Center. Swift is being developed based on frequent, <br /> limited stop, all-day bus service using higher capacity buses; rail-like passenger stations; the <br /> latest in ITS technologies; transit signal priority; business access transit lanes; plus the <br /> installation of off-board ticket vending machines to increase transit capacity, speed and <br /> reliability in the corridor. The project will eliminate the existing service gap between Aurora <br /> Village and downtown Everett and substantially improve the passenger capacity and transit <br /> service quality along the corridor. <br /> t C ►Ill" 1 " II•Ia. <br /> EVERETT TRANSIT Site Plan Concept C4 <br /> r - <br /> t <br /> • <br /> IBI - <br /> • <br /> SWI - . <br /> *member&2007 <br /> Overhead of general location at Everett Station, 3201 Smith Ave. Red Rectangle is proposed <br /> sight location for the 4 bus bay terminal in a portion of the South Parking Lot Area. <br /> 6 <br /> SCOPE OF SERVICES,PAGE 2 OF 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.