Laserfiche WebLink
--,3.-� <br /> � � �' <br /> A � x <br /> C H <br /> � e,a•3 CA <br /> H :°' � <br /> fC C� <br /> H �1 <br /> � H � INFGRMATIGN FOR DE�'ELOPER: <br /> fA H <br /> H � <br /> � � t7 1 . Cir.y streets and alleys are tu be kept clet�r of dirt <br /> and debris at all times during construction. Dust <br /> Ht'�� g suppression and sireet cleaning must occur as di_ected <br /> zH� by the Pub.lic Works Inspector. <br /> Hz <br /> H y 2 . A one-year guarantee is reqiiired on the public street, <br /> �yy H uti.lity and. site landscapinq for an amount not less <br /> �Cyy than 10� of the cost of construction, and shall run for <br /> one year from the date of issuance of the first <br /> �� � Occupancy Parmit for. the project. <br /> HOf�p <br /> 3 . An on-site watermain will be staked within an easement <br /> to the City. The easement will be submitt:ed to the <br /> i:ity prior to the issuance of permits. <br /> 4. As-builts of storm sewer, sanitary sewer, and water <br /> system� will be required to be submitted per City <br /> design and construction standards and specifications. <br /> 5. Any gradinq/fill on this site shall be done so as to <br /> not impact the surrounding properties. <br /> 6. Permits must be obtained for all fill removed from the <br /> / • <br /> site and placed within the City limits. Zt takes <br /> p� about 35 days (a SEPA review) to obtain permits Lor <br /> � L,.� any specific site. There is currently a lack of <br /> adequate permitted fill sites within the City limits. <br /> 1 '��' 7. Detailed drawings in accordance with City Design and <br /> .��� Construction Standards shall bF submitted to the Public <br /> �, Works Department showing site parking layout, <br /> landscaping, utilities, storm drainage, temporary <br /> construction erosion control, and all required <br /> I �,� ' improvements :n the public right-of-way. Public Works <br /> Department approval of these drawinqs is required prior <br /> te any permits being issued. All improvements shall be <br /> t,� completed and approved warranted before the Occupancy <br /> �+ Permit is issued. <br /> 8. Special charges for connection to the sewer and water <br /> system in accordance with Ordinance 1171-85 are <br /> � �t` applicable. The actual �;ost shall be computed by the <br /> Building Departm�nt per the ordinance in effect at the <br /> � time and according to the information provided on the <br /> � aprroved plans on the date of permit issuance. <br /> 1 ��' 9. Any broken or damaged sidewalk shall be <br /> � zepaired/replaced per the City Public Works Inspector. <br /> 10. Parkiny must be per City Zoning Code and City Design <br /> and Construction Standards. <br />