Laserfiche WebLink
• <br /> vi <br /> 2. Air <br /> a. What types of emissions to the air would result from the proposal(i.e.,dust, <br /> automobile,odors, industrial wood smoke)during construction and when the project is <br /> completed? If any,generally describe and give approximate quantities if known. <br /> Dust and equipment/vehicle emissions will be generated during construction. Operation <br /> impacts will be primarily from vehicle traffic. Odors associated with residential use, <br /> such as barbeques,will be generated. <br /> b. Are there any off-site sources of emissions or odor that may affect your proposal? <br /> If so,generally describe. <br /> Kimberly Clark operates a plant that has had occasional odor problems. <br /> c. Proposed measures to reduce or control emissions or other impacts to air, if any: <br /> Dust emissions during construction must be controlled per City and PSCAA standards. <br /> 3. Water <br /> a. Surface: <br /> 1) Is there any surface water body on or in the immediate vicinity of the site <br /> (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, <br /> describe type and provide names. If appropriate, state what streamor river it flows into. <br /> No. <br /> 2) Will the project require any work over, in, or adjacent to(within 200 feet)the <br /> described waters? If yes, please describe and attach available plans. <br /> N/A <br /> 3) Estimate the amount of fill and dredge material that would be placed in or <br /> removed from surface water or wetlands and indicate the area of the site that would be <br /> affected. Indicate the source of fill materials. <br /> None known/ <br /> 4) Will the proposal require surface water withdrawals or diversions? Give <br /> general description,purpose,and approximate quantities if known. <br /> No. <br /> 5) Does the proposal lie with a 100-year floodplain? If so, note location on the site <br /> plan. <br /> No. <br /> 6) Does the proposal involve any discharges of waste materials to surface waters? <br /> If so,describe the type of waste and anticipated volume of discharge. <br /> None known. <br /> b. Ground <br /> 1) Will ground water be withdrawn, or will water be discharge to ground water? <br /> Give general description,purpose,and approximate quantities, if known. <br /> No. <br /> 4 <br />