My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8530 5TH AVE W 2016-01-01 MF Import
>
Address Records
>
5TH AVE W
>
8530
>
8530 5TH AVE W 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 10:19:03 AM
Creation date
4/3/2017 10:18:34 AM
Metadata
Fields
Template:
Address Document
Street Name
5TH AVE W
Street Number
8530
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS DEPARTMENT �� � � � � � � D <br /> UTILITIES DIVISION Id�,aY 08 1985 <br /> 3200 CEDAR STREET <br /> EVERETT, WASHINGTON .............................................___.. <br /> .CITY OF EVERETi' <br /> Put:ic N'orks DepY. <br /> COST ESTIMA'PE SHEET <br /> Requested by Gordon Witcher Date of Request 5-7••85 <br /> Address Engineering Phone 259-SE11 <br /> Installation Iocation Hardeson s BSth <br /> Installation type/description/size/etc. furnish and install two 8" tapping sleeves, <br /> two 8" valves and make two 8"hot taps <br /> Total Estimated Cost 52396.00 <br /> This estimate reflects the Utilities Division having to Saw cut. .., ... . . . . . <br /> provide labor, equipment and materials to complete the above Shoring.. . . . . . . . . . ._ <br /> mentioned installation including, but not limited to, the Excavation. . . . . ... . <br /> items identified to the right. Any labor and/or equipment Backfill... .. . . .. . . <br /> provided by the contractor to facilitate the work by the Ci[y Compaction. . ... .. . . <br /> water department: will be reflected in a refund to the person Temporary Patch. . . . <br /> making the depos:t. Permanent Patch. . . . <br /> Furnish double check valve assembly <br /> for tempora.q water supply. . . . . ._ <br /> Final hook-up after purity <br /> and pressure testing. . ._ ' <br /> (Whenever the estimated cost is not sufficient to cover the total expense for labor, <br /> material, equipment rental and adminis[rative costs, [he deficit shall be charged to the <br /> property for which sur.h installation was made and the owner thereof, and provided <br /> further, that any excess paymen[ shall be returned to the person applping for the I <br /> installation.) , <br /> Itemiaed Cost Estimate: <br /> Labor & Overhead 699.00 / /�l,r�"7(C���/,p�-�:��_��_ 259-esai <br /> Material 1993.0o Estimate Prepared By Phone li <br /> Equipment Rental 204.00 �on weitkamp <br /> Surface Restoration cc: Larry Callaha❑ <br /> T4TAL ESTIMATE 2396.0o Don W.ahl <br /> Larry Cr:�wfo:d <br /> Bob Chervenell <br /> Bud Krom <br />
The URL can be used to link to this page
Your browser does not support the video tag.