Laserfiche WebLink
� � i <br /> Inforr,.a[ton for Developer <br /> 1« Detailed �rawings in accerdance with City design and construction <br /> staadsrds ahall be submi[[ted ta the Public Works Department Ahowing <br /> site parking layout, landacaping, utilities, storm drainage, tem?�rary <br /> cor.s[ruction erosion control, and all required imprcvements in the <br /> public righ[-of-vay. Public Works �epar[men[ appr.ova.l of these <br /> �rawinga is required prior to an} permits beinn i.ssued. All. <br /> improvements sha11 be completed., apprr,vzd, aad a�ac.-an[ed before the <br /> Occupancy Permit is iasued. <br /> 2. City s[reets are to be kept clear of dirt anu debris at all ti�es <br /> during construction. Dust suppression and atreet cleaning must occur <br /> as directed by the P�blic Works Inspector. <br /> 3. Performance guarantees are required for utility mains and 2andscaping. <br /> 4. A one year guarantee is required on the public utility mains and <br /> landscaping for an amount not less than 10% of the cos[ of constructiun <br /> and shall run for one year from the date of issuance of the first <br /> Occupancy Permit for the pro�ect. <br /> 5, A two year guarantee is iequired for private re[ention/detention or <br /> other drainage treatment/aba[ement facilities serving areas larger than <br /> one acrc:. <br /> I <br /> 6. On-site watermain will be staked within an easement [o the City. 'Fhe <br /> easement w:111 be ��bmitted to the Ci[y prior to issuance of permits. <br /> I <br /> 7. As-builts of storm sewer, sanitary sewer, and water sys:ems will be <br /> required to be submitted per City design and cons[ruction standards and <br /> specifications. <br /> 11ti9G <br />