Laserfiche WebLink
! <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> ',.5. Connect side sewer per City Standard #601. <br /> 6. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> (`8. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration sys,tem per City of Everett <br /> Storm Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See <br /> attachment for more details. <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing priur to beginning the project. <br /> 11. install erosion control measures as determined by the P��blic Works inspecto�, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Everett Standards for smail parcels <br /> 13. Remove erosion control measures upon completion of the project prior to final approval of the <br /> permit. <br /> 14. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allbwed on this building lot. <br /> 15. Remcve and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector(i.e. aIl unused <br /> driveways and any broken or damaged area must be replaced). <br /> 46. install a Type I concrete driveway per City of Everett Standard #307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> 18. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #i410 is <br /> required for the parking area. I <br /> 20. if a sewer pump system is to be instailed, the pressure line must discharge into a private I, <br /> manhole, then gravity flow across ihe public right-of-way. I <br /> 21. A sprinkler system is required for this building in compiiance with the requirements of NFDA ' <br /> Standards 13D. <br /> PWComments � I'� <br /> -- - - - --- --���---� <br />