My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2205 5TH ST 2016-01-01 MF Import
>
Address Records
>
5TH ST
>
2205
>
2205 5TH ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 11:18:32 AM
Creation date
4/3/2017 11:18:20 AM
Metadata
Fields
Template:
Address Document
Street Name
5TH ST
Street Number
2205
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> CIASED CM WORK ORDERS REPORT <br /> Total Utility Maintenance Manaqement System <br /> 06/06/1994 <br /> aa�nsm�maa======'=�ss==v�====____=__��=__= P0CJ2 1 <br /> mc3e�=v_v�vovevccv=_o=ae=ceovxsasaeaa� <br /> Date Range :05/O1/1992 - 05/31/1994 <br /> CM Work Order Range :<glank> - 8405421080229 Pattern :7401196750866 <br /> Item Range :<Blank> - WW2202o001 Pattern :* <br /> Program ALL Function ALL Activity ALL <br /> CM WORK ORDER ID: 7401196750866 Title: CONVERT 2205 STH ST <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: WS0895V007 -- WATER SERVICE <br /> Location ID: __ <br /> Program 740 Function 119 Activity 675 <br /> Date Completed: 05/25/1994 <br /> . Overall Craft: <br /> Issued: 05/13/1994 Issued by: SKL Assigned to: <br /> Out of Service? NO Priority: Travel Time: 0. 00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: <br /> Labor: <br /> � Craft ID Name Planned Hrs Actual Hrs Cost <br /> , ----- ------ ------------------ <br /> ------------ ----------- <br /> UL NSO NIEISEN, SCOTT O. �----- <br /> ; UL TDE1 THOMPSON, DWAYNE E. �.00 4.00 57.40 <br /> 0.00 4 . 00 54.72 <br /> Total Labor Cost: 112. 12 <br /> � <br /> Materials: <br /> . =D Description Date # Used Cost <br /> �----------- ------------------------------ <br /> -------- -------- ---------- <br /> ADAp34000347 ADAPTER 3/4° CST X INSTA-TITE@ 05/25/1994 3 2g.gg <br />� � BOX000056247 BOX METER PLA 15'� X 10" W/LID 05/25/1994 1 13.49 <br /> � COOP34004347 COUPLING 3/4" MIP X COP ELL @ 05/25/1994 1 3.50 <br /> COUP34Q04747 COUPLING 3/4° ANG MET X COP @ 05/25/1994 1 5.91. <br />, COUP34142847 COUPLING 3/4" CTN X 3/4" MIP € O5/25/1994 1 Z,g� <br /> PIPE34060647 PIPE 3/4" POLY I.p.S. O5/25/1994 2 0.50 <br /> VALV34008648 VALVE METR 3/4" L/W FLARD COP@ 05/25/1994 1 9.33 <br /> Total Material Cost: 59 58 <br /> Vehicles: <br /> =D Description Date Hours Cost <br /> ---------- ------------------------------ / / <br /> -------- ------ ---------- <br /> V2139 SVC TRUCK CHEV 86 05 25 1994 4.00 20.40 <br /> I ---------- <br /> Total Vehicle Cost: 20.40 <br /> Work Description: <br />� - ------------------------------------ <br /> ------------------------------------------ <br /> BOX IS SET IN VINE GROUND COVER WILL BE COVERED SOON. <br /> METER #11364 <br />
The URL can be used to link to this page
Your browser does not support the video tag.