My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2205 5TH ST 2016-01-01 MF Import
>
Address Records
>
5TH ST
>
2205
>
2205 5TH ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 11:18:32 AM
Creation date
4/3/2017 11:18:20 AM
Metadata
Fields
Template:
Address Document
Street Name
5TH ST
Street Number
2205
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^ PUBLIC Vh�ORKS PERMIT Date: 11/13/2009 �� <br /> Public Works Permit#: PW0911-024 <br /> City of Everett P�iblic Works Department <br /> ` � 3200 Cedar Street Buildinq Permit#; 80911-006 <br /> Everett, '.NA 98201 Planninq Reference#: <br /> (425) 257-8810 <br /> public Works Fee $: $ 25.00 <br /> Other$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> STEWART PAUL 8 AMY <br /> 2205 5TH ST <br /> EVERETT WA 98201 <br /> PHONE: 4252520394 PHONE: <br /> TAX PARCE�ID# 00497100002700 SITE ADDRESS: 2205 5TH ST <br /> DESCRIPTION OF PROPUSED WORK: <br /> NEW ATTACHED GARAGE <br /> PERMIT CONDITIONS <br /> 1. AII calls for inspectior� shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Connect all rooftop downspouts to the side sewer. <br /> 5. The contractor must meet with the Public Works Inspeci,,r, Randy Allen at 425339-7403, to discuss potential � <br /> drainage routing prior to beginnin� the project. �„y <br /> 6. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw baies, � <br /> swales, or erosion blankets. <br /> 7. Remove erosion control measures upon completion of the project prior to final approval of the permit. O <br /> 8. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, permitted site. � <br /> No wasting of material is allowed on this building lot. <br /> 9. No dirt, mud, rocks or debns to be tracked onto roadway. z <br /> 10. No building materials to be stacked on roadway and roadH�ay to be kept clean and open for pedestrian travel. O <br /> ;� ''� ',';' � <br /> � � . <br /> , �� , , <br /> ,� ��o�� i R ���5' �;;"��! a <br /> : ���,. ���. <br /> �`)'� � � .�1 � �� <br /> � '. ���.., / <br /> ACKNOWLEDGEMENT OF CONDIT�ONS <br /> The undersigned owner/applicanl hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages, costs,expenses, or causes oi action that may arise <br /> because o(installation and maintenance oi lhe improvement <br /> , � � � ,�j�rj or other righ4of-way use hereto applied for and further agrees <br /> —' to remove same upon notice from lhe City and to replace <br /> Ap e or pnstr tio Date public property damaged thereby. <br /> � �'„� ' ,��,� 2 — — � l/ �`_` , c��r <br /> NAL INSP TION Date �`` " � // /6 � <br /> Approved as Constructed Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERh1IT h1UST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFfER IS TO BE DILIGENTLY <br /> PIiRSUED TO COMPLETION. THIS PtitI�1R MAY BE G4tJCELI.ED BY THE CIIY UPON ANY STOPPAGE OF WORK ON THIS PROJEC7 OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.