My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/12/31 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/12/31 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 11:45:09 AM
Creation date
4/3/2017 11:44:47 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/31/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Amendment No. 2 to X Consent COUNCIL BILL# <br /> Professional Services Action Originating Department PW/Utilities <br /> Agreement with Roth Hill First Reading Contact Person David Voigt <br /> Engineering Partners, LLC for Second Reading Phone Number 425-257-8983 <br /> Engineering Services for the Third Reading FOR AGENDA OF December 31, <br /> Sewer System Replacement"I" 2008 <br /> and Water Main Replacement Public Hearing <br /> "J"Projects. Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> North Everett Amendment No.1 for Amendment No. 2 <br /> additional engineering <br /> services, October 11, <br /> 2006 <br /> Amount Budgeted $350,000 <br /> Expenditure Required $0 Account Number(s): UP 3264,UP 3263 <br /> Budget Remaining $150,000 <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> This amendment is to extend the term of the Professional Services Agreement through January 31, 2009 in <br /> order to finish final contract items. There is no cost adjustment associated with this amendment. <br /> Roth Hill Engineering Paitners, LLC has completed design services for Sewer System Replacement"P" and <br /> Water Main Replacement"J" Projects. The project replaced deteriorated sewers and water mains in north <br /> Everett, and construction is complete. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Amendment No. 2 to Professional Services Agreement with Roth Hill <br /> Engineering Partners, LLC for engineering services for the Sewer System Replacement"I" and Water Main <br /> Replacement"J"Projects for no additional costs. <br /> 1 <br /> C:\Documents and Settings\SuClark\Desktop\123108 Council\RothHill Amendmt#2 Cncl Agenda.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.