Laserfiche WebLink
0, FF4 MC>Fi—r" NOTE TO SURVEYOR: N.E. 114, SECTION 19, T.28N., R-5E., W.M. <br />"mmmmmummm" BUILDING AND PARKING LOCATIONS ARE AS PROVIDED BY RUTLEDGE MAUL ARCHITECTS. <br />0 20 40 80 CONFIRM LOCATIONS AND DIMENSIONS NTH THEM BEFORE CONSTRUCTION. <br />f W1,41-811 is EXIST CH <br />IE=479.93-12"S <br />T GR 4 E. <br />- - - - - - - - - - DR�VY 4 718. 432� 15% <br />EXIST CO _j_ _L ORWY L TDRNY FH <br />-4-1- _-_ - _41 - - — - - - - - - - — - - - - - - - — - DFIWY <br />0 1 DOTH STREET SSMH L-My. <br />IE-485.53 RIM=482.63 <br />3' room 9 T 0 IE-478.16-8' <br />r <br />u) <br />RIM=495.57 0 r - -_-___--_.--RILL._- <br />IE=477.49-8 WV <br />�Ik N!, IV 1:, 11, '41 y 14, .41 14, 41 <br />w IV IV ILI 1k 14, IV 14, 41 <br />.. ......... <br />EAST SDM <br />RIM=494.317 6 10 1 <br />i �` .1 1 FF 18, <br />E-491.52-12-NId r __r rwe <br />I — 1 14, 11, \ <br />91 <br />f Li <br />E. 'BOUNDARY (TYP)' <br />5 17 CONSTRUCT SWT RAILFENCE ALONG ALL N.G.P.E. BOUNDARIE <br />S <br />LIMIT OF <br />4B7 IV '41 CLEARING <br />(TYP) <br />FH <br />5 l j��l�r <br />14, <br />IL- ns L <br />L4 1 11 <br />1 00th P!A -MITIGATION PLANS <br />L. S.E. 3♦ <br />-------- I THIS /ffA <br />..... / 151MIG,3 \. <br />Z <br />w <br />Loal <br />Ld <br />z <br />Ld <br />101st PL. S.E. <br />EXIST 2.50.5' <br />SIGNAL LOOP <br />i-BOX <br />TEMPORARY <br />�3�5.25 3 3 <br />x <br />-HE -41 <br />LIMIT OF <br />CLEARING 15 <br />ZAN (TY�) <br />\ \ <br />41 <br />FF - <br />q, 41 <br />485 <br />N <br />---486 <br />1k 14, <br />TOT` <br />lJJ I <br />REC I V/ <br />BLDG <br />FF 4 <br />��_ /� I <br />Ij <br />V <br />14, \V IV IV IV 41 <br />2 A� <br />41 <br />80 <br />14, vk EXISTING WETLAND <br />LIMIT OF, <br />UUNDARY + /GLE. - <br />N 31 <br />RAISED BdLINDkkY <br />(tLE V=-4-F=TZr-_c7\7` <br />q, y IV y 11, W 1k y '41 14, y y v y %41 + 1p %41 %1, %1, -41 IV <br />%41 y -k -41 <br />14, %P .4o \11 w 1k 11, .41 IV q, ILI -41 11, .40 <br />LIKArT OF'p <br />�uCLEARING (VP) 4, 14, %1, y y y %1, 14, y ILI -41 1p y .41 1L. y y 14, y 14, 1p < <br />+ <br />3 14, <br />-41 ILI <br />%4, %41 y y 41 14, .41 14, N.G.P.E, BO <br />UNDARY) (TYP) <br />-' \ ,.E't� r5� I\ \1',�476 T_ CONSTRUCTSPLIT RAIL FENC <br />14, 41 IV 14, 14, 14, %1, 1k 1p ALONQ ALL N.GP.E. 804DARIES <br />4 i� All <br />41 rA IN Ou AL 11, \V \11 41 IV 14, .4o %41 11, 1�1 + + I, -4o <br />P TECTIO <br />-BE IE 135. <br />480 11 %41 1p y v NP IL. %I, <br />1k 1:1 1k 1k <br />it <br />- ------ - ------- \I, '41 14, <br />-41 <br />4 <br />MINIMUM WATER SURFACE <br />47♦ELFeV. *i15.5 4 + <br />1. 1p 14, ILI 1p <br />�4, <br />M, <br />STANDARD TES <br />M. APPROVAL OF THIS PLAN DOES NOT CONSTITUTE AN APPROVAL OF DESIGN, SIZE NOR <br />C NOTES STANDARD TESC NOTES: (CONT) TFALL <br />A. ALL PERIMETER EROSION AND SEDIMENT CONTROL SHALL BE CONSTRUCTED, <br />OPERATIONAL, AND INSPECTED BY THE PUBLIC WORKS INSPECTOR. NO TREES SHALL IE= 7s -:4 41 <br />BE REMOVED UNTIL PERMISSION IS OBTAINED FROM THE APPROPRIATE PARTIES. <br />LOCATION OF PIPES, RESTRICTORS, OR DETENTION FACILITIES; BUT IS AN APPROVAL OF <br />GRADING AND SEDIMENTATION CONTROL PLAN ONLY. 1 11 / , t 1/ 4 "1t U 41 4. <br />5 <br />5 <br />. i 6 Ixk� A.-A"."i <br />BLDO�5, FF 487. <br />GAS <br />B. <br />WHERE POSSIBLE, NATURAL VEGETATION SHALL BE MAINTAINED FOR EROSION AND <br />SEDIMENT CONTROL <br />N. <br />THE PUBLIC RIGHT-OF-WAY SHALL BE KEPT CLEAN. TRACKING OF MUD AND DEBRIS <br />FROM THE SITE WILL NOT BE ALLOWED. FAILURE TO COMPLY WITH THIS CONDITION WILL <br />C. <br />ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMP'S SHALL BE MAINTAINED IN A <br />RESULT IN ALL WORK ON THE SITE BEING STOPPED. <br />SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS <br />COMPLETED, PERMANENT DRAINAGE FACILITIES ARE OPERATIONAL, AND THE POTENTIAL <br />FOR EROSION HAS PASSED. <br />CONSTRUCTION SEQUENCE AND NOTES: <br />D. <br />AT A MINIMUM, EROSION AND SEDIMENT CONTROL FACILITIES SHALL BE MAINTAINED <br />0 <br />FLAG CLEARING LIMITS. <br />MONTHLY, OR FOLLOWING EACH RUNOFF -PRODUCING STORM, TO ENSURE PROPER <br />OPERATION OF ALL EROSION AND SEDIMENT CONTROL FACILITIES. <br />2OSCHEDULE <br />AND CONDUCT PRECONSTRUCTION MEETING. <br />E. <br />APPROVAL OF THIS PLAN DOES NOT CONSTITUTE AN APPROVAL OF DESIGN, SIZE, NOR03 <br />INSTALL SILT FENCE ALONG CLEARING LIMITS WHERE SHOWN PER STD 2058. <br />LOCATION OF PERMANENT PIPES, RESTRICTORS, OR DETENTION FACILITIES; BUT IS AN <br />(SEE TESC PLAN NOTE 2) <br />APPROVAL OF EROSION AND SEDIMENT CONTROL BMP'S ONLY. <br />OF. <br />LOG AREA WITHIN CLEARING UNITS, HAZARDOUS TREES WITHIN BUFFERS AND TREES <br />THE PUBLIC RIGHT-OF-WAY SHALL BE KEPT CLEAN. TRACKING OF MUD AND DEBRIS <br />TO BE REMOVED WITHIN THE WEILAND MITIGATION AREAS. (SEE TESC PLAN NOTE 5) <br />FROM THE SITE WILL NOT BE ALLOWED. FAILURE TO COMPLY WITH THIS COND'.11ON WILL <br />RESULT IN ALL WORK ON THE SITE BEING STOPPED. <br />SOCUT <br />TEMPORARY DITCH WHERE SHOWN AND CONSTRUCT TEMPORARY INTAKE M EXIST <br />CB AS NECESSARY TO ROUTE OFFSITE DRAINAGE AWAY FROM CONSTRUCTION AREA. <br />G. <br />THE WASHINGTON STATE CLEAN AIR ACT REQUIRES THE USE OF ALL KNOWN, AVAILABLE, <br />AND REASONABLE MEANS OF CONTROLLING AIR POLLUTION, INCLUDING DUST. DUST CAN <br />6OINSTALL <br />TEMPORARY 12'X30* CULVERT WHERE SHOWN. <br />BE CONTROLLED BY WETTING EXPOSED SOILS, WASHING TRUCK WHEELS BEFORE THEY <br />LEAVE THE SITE, AND INSTALLING AND MAINTAINING ROCK CONSTRUCTION ENTRANCES. <br />0 <br />INSTALL TEMPORARY CONSTRUCTION ENTRANCE WHERE SHOWN PER ST) 208. <br />CONSTRUCTION VEHICLE TRACK -OUT IS A MAJOR SOURCE OF DUST AND ANY EVIDENCE OF <br />TRACK -OUT CAN TRIGGER FINES FROM THE DEPARTMENT OF ECOLOGY OR THE PUGET <br />8. <br />GRUB AND ROUGH GRADE SITE. <br />SOUND AIR POLLUTION CONTROL AGENCY. <br />H. <br />THE TEMPORARY EROSION CONTROL SYSTEM SHALL BE INSTALLED AND INSPECTED BY <br />O <br />INSTALL ENCLOSED STORM DRAIN SYSTEM AS NECESSARY TO ROUTE SITE DRAINAGE <br />THE PUBLIC WORKS INSPECTOR PRIOR TO ALL OTHER CONSTRUCTION. <br />M SEDIMENT POND. <br />1. <br />WHERE POSSIBLE NATURAL VEGETATION WILL BE MAINTAINED FOR SILT CONTROL <br />10 <br />CONSTRUCT TEMPORARY INTERCEPTOR SWALES PER STD 201 WHERE NECESSARY TO <br />ROUTE DRAINAGE TO SEDIMENT CONTROL AREAS. <br />J. <br />AS CONSTRUCTION PROGRESSES AND SEASONAL CONDITIONS DICTATE, THE EROSION <br />CONTROL FACILITIES SHALL BE MAINTANEr AND/OR ALTERED AS REQUIRED BY THE CITY <br />0) <br />INSTALL SEDIMENT POND OUTLET FILTER WHERE SHOWN PER STD 203. <br />ENGINEER TO ENSURE CONTINUING EROSION/SEDIMENTATION CONTROL <br />12. <br />CONSTRUCT BUILDING FOUNDATIONS, STORM, SEWER AND WATER SYSTEMS. <br />K. <br />TEMPORARY SILTATION PONDS AND ALL TEMPORARY SILTATION CONTROLS SHALL BE <br />13. <br />BUILDING CONSTRUCTION. <br />MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR <br />CONSTRUCTION IS COMPLETED, PERMANENT DRAINAGE FACILITIES ARE OPERATIONAL, AND <br />THE POTENTIAL FOR EROSION HAS PASSED. <br />14. <br />FINE GRADE AND PAVE, CONSTRUCT FRONTAGE IMPROVEMENTS. <br />L. <br />ALL DISTURBED LAND AREAS THAT WILL BE LEFT FOR 30 DAYS OR MORE DURING THE <br />15 <br />THREAD PATH THROUGH BUFFER AREAS AS NECESSARY TO KEEP CLEARING AND <br />PERIODS OF MARCH I TO MAY 15 AND AUGUST 15 10 OCTOBER I SHALL BE IMMEDIATELY <br />GRADING TO A MINIMUM. <br />SEEDED WITH A MIX AND BY A METHOD APPROVED BY THE PUBLIC WORKS DEPARTMENT <br />16. <br />LANDSCAPE/HYDROSEED EXPOSED SOIL <br />AND MAINTAINED UNTIL SEED GERMINATION IS ASSURED. IN ADDITION TO SEEDING, <br />SLOPES OF 25% OR GREATER WLL BE MULCHED WITH 2 TONS OF STRAW PER ACRE, <br />OR WTH AN APPROVAL EQUAL <br />17, <br />REMOVE EROSION CONTROL MEASURES ONLY AFTER POTENTIAL FOR EROSION <br />DURING THE REST OF THE YEAR, TEMPORARY SOIL STABILIZATION MUST BE APPLIED <br />IS PAST. <br />IMMEDIATELY TO DISTURBED AREAS THAT WILL BE LEFT EXPOSED FOR 7 DAYS OR MORE, <br />AND IMMEDIATELY TO SLOPES GREATER THAN 25% THAT WILL BE LEFT EXPOSED FOR 3 <br />8 <br />RESTORE BUFFER WHERE DISTURBED BY CONSTRUCTION ACTIVITIES. PLANT WITH <br />DAYS OR MORE. <br />4' DOUGLAS FIR AND HEMLOCK (SPACED 12-O.C,) AND I GAL SALAL CLUMPS OF 10 <br />(I PER 10 SO. FT.). TOTAL - 36 CONIFERS, 280 SALAL <br />4 <br />FF <br />0 <br />11i <br />FF <br />- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - — - - - SS <br />x <br />480 <br />481. <br />7 <br />CONC\1143T. CURB @ GUTTER <br />%p <br />W/ <br />IE: <br />LEGEND I : ;Z ( <br />SSMH <br />_�E xam N 821 CLEARING LIMITS*%4gPrJJ <br />AX IV41161 W f <br />IE=474.26 V' <br />3 <br />BUFFER LINE ...... , 4 Al <br />TEMPORARY CONSTRUCTION FENCE SPHALT ­ - ----- R-50 00 <br />X X X SILT FENCE PER STD. 2058 AND A <br />ROCKERY, LOCK BLOCK WALL OR EQUAL <br />------------ .. . .... -rn-- <br />BUFFER LINE = CLEARING LIMITS ...... <br />EXCEPT WHERE INDICATED �z ---- 471 <br />_476- <br />r kit 94 <br />T.E.S.C. PLAN NOTES: IE-471 <br />1 THE FOLLOWING BEST MANAGEMENT PRACTICES (EMP-S) MUST BE FOLLOWED . ''S <br />G "--1%1 <br />�J 4. <br />475 <br />�,414 <br />cis <br />472 <br />I Fw UN <br />41 b <br />14, .41 ILI <br />dEA NGp 11, w�J <br />10 <br />0 <br />ATFALL, <br />ITFALL PROTECTION <br />Li',,'END SPLIT RA r rpmrr ® rn i-A IkAFf\ITATIOKI <br />97 <br />3 <br />4 fT 0 LEA NG <br />\ y y 1 <br />,4, IV <br />'k&A S r' <br />EX RT. <br />0 <br />ko <br />(712 <br />0 <br />z <br />z > <br />"1kGU TER ' 01 <br />FOR ALL CONSTRUCTION WORK THROUGH AND IMMEDIATELY ADJACENT TO <br />ENVIRONMENTALLY SENSITIVE AREAS AND THEIR BUFFERS, UNLESS OTHER WISE 41 Id <br />It <br />REQUIRED BY A PERMIT ISSUED BY A FEDERAL OR STATE AGENCY. "r <br />_RILL0. <br />DATE: MARCH, 1993 <br />NN7 .... ....... <br />- CONSTRUCTION STAGING AREAS MUST BE LOCATED OUTSIDE OF <br />DESIGN: ANM <br />ENVIRONMENTALLY SENSITIVE AREAS AND THEIR BUFFERS. THE WETLANDS,erg DRAWN: KIMN/CLK <br />BUFFERS, STAGING AREAS AND CONSTRUCTI(N LIMITS SHALL BE CLEARLY SHOWN ------- <br />ON CONSTRUCTION PLANS. CONSTRUCTION UNITS SHALL BE CLEARLY M > CHECKED: JNM <br />MARKED IN 2. TEMPORARY CONSTRUCTION FENCING MUST BE PROVIDED ALONG THE WETLAND 5. ANY TREES IN THE BUFFERS THAT ARE HAZARDOUS (I.E., ARE �DISEASED, <br />L REVISION <br />NUMBER: <br />THE FIELD WITH ORANGE CONSTRUCTION FENCING OR AN ALTERNATIVE APPROVED BUFFERS TO KEEP CONSTRUCTION EQUIPMENT AND ACTIVITY OUT OF THOSE DAMAGED OR LEANING AND ARE LIKELY TO FALL ON DEVELOPMENT) MUST BE <br />BY THE CITY. AREAS. REMOVED PRIOR TO ISSUANCE OF OCCUPANCY PERMITS. SOME LARGE WOODY <br />DEBRIS SHOULD BE RETAINED WHERE IT WOULD NOT CREATE A HAZARD, SUCH AS <br />- WORK SHALL BE DONE SO AS TO MINIMIZE TURBIDITY, EROSION, AND OTHER WATER PRIOR TO INITIATION OF CONSTRUCTION, THE WETLAND BIOLOGIST MUST INSPECT <br />QUALITY IMPACTS. CAUSING FLOODING DUE TO ALTERATION OF THE NATURAL HYDROLOGY. THE 'S <br />CONSTRUCTION FENCING/FLAGGING ALONG WEILAND BUFFERS/CONSTRUCTION ., -1 --�- ! c; - - SCALE: 1"=40' <br />WEILAND BIOLOGIST MUST APPROVE PLACEMENT OF WOODY DEBRIS IN THE <br />LIMITS TO ENSURE THAT FENCING IS LOCATED PROPERLY. THE BIOLOGIST SHOULD BUFFERS AND WETLANDS. <br />- PROPER EROSION AND SEDIMENT CONTROL MEASURES SHALL BE FOLLOWED TO INSPECT THE SITE OCCASIONALLY DURING CONSTRUCTION, AND SHALL HAVE q 7TH AVE SE r <br />PREVENT SEDIMENTS FROM ENTERING CREEKS OR WETLANDS. EROSION CONTROL AUTHORITY TO STOP SITE &ORK IMMEDIATELY IF THE BIOLOGIST DETERMINES THAT R/W I JT MEASURES SHALL BE APPROVED BY THE DEPARTMENT OF ENGINEERING AND THE HAZARDOUS TREE EXPERT MUST BE ON SITE DURING REMOVAL OF THE PROJECT NUMBER: <br />PUBUC SERVICES AND/OR AGENCIES WITH JURISDICTION. WORK ACTIVITIES VIOLATE BUFFER AND SETBACK REQUIREMENTS. HAZARDOUS TREES IN THE BUFFER. ONLY THOSE HAZARDOUS TREES WITH THE 1 30- ECLI <br />THINNING OF THE REMAINING TREES WILL NOT BE PERMITTED. DEAD LIMBS 1 TO Aw p4s TIC:� 'rCWX0084 <br />PRIOR TO ISSUANCE OF OCCUPANCY PERMITS, PERMANENT FENCING MUST BE POTENTIAL TO STRIKE STRUCTURES OR IMPROVEMENTS SHALL BE REMOVED. 20.5 2' M11 <br />- EROSION CONTROL MEASURES SHALL BE IN PLACE AND INSPECTED PRIOR TO PROVIDED ALONG THE BOUNDARY OF THE BUFFERS. LOCATED WTHIN 40 FEET OF STRUCTURES MAY BE REMOVED AS RECOMMENDED IN ILT JFLN I EES PRQJECT. 0PRO L FORT`. IS P� <br />COMMENCEMENT OF WORK, ALL EROSION CONTROL STRUCTURES SHALL BE I ER STD 20 CONDITIC:%"L PER ('L1PPFN- <br />THE HAZARDOUS TREE REPORT. SHEET NO. <br />INSPECTED REGULARLY TO ENSURE THEY ARE MAINTAINED IN WORKING ORDER. 3. THE WEILAND BIOLOGIST SHALL BE ON SITE DURING CONSTRUCTION OF THE mci E,<P;: j _4"-/ <br />WETLAND MITIGATION AND TRAIL. PRIOR TO ISSUANCE OF ANY OCCUPANCY TREES REMOVED FROM THE BUFFER SHALL BE REPLACED AT A RATIO OF 3:1 <br />- WHEN OPERATING MACHINERY IN OR NEAR THE WETLANDS, EXTREME CARE SHALL PERMITS, REPORT MUST BE SUBMITTED BY THE WEILAND EXPERT STATING THAT UNLESS THE TREE CAN BE SNAGGED OR USED AS A NURSERY LOG (WHILE STILL EXISTING PAVEMENT P <br />t BE TAKEN TO PREVENT ANY PETROLEUM PRODUCTS, CEMENT, CHEMICALS, OR THE CONSTRUCTION WAS COMPLETED PER APPROVED PLANS. 2 --2j <br />ELIMINATING THE HAZARD), IN WHICH CASE THE REPLACEMENT O <br />OTHER TOXIC OR DELETERIOUS MATERIALS FROM ENTERING THE WATER. IF A SPILL RATIO SHALL BE 2:1. TEMPORARY <br />DOES OCCUR, WORK SHALL BE STOPPED IMMEDIATELY AND ECOLOGY'S SPILL TREES SHOULD BE SNAGGED AT A MINIMUM HEIGHT OF 10 FEET TO PROVIDE <br />RESPONSE SECTION CONTACTED. 4. THE TRAIL MUST BE LOCATED IN DISTURBED AREAS WHERE FEASIBLE AND SHALL WILDLIFE HABITAT. DITCH <br />MINIMIZE DISTURBANCE TO EXISTING VEGETATION. PRIOR TO CONSTRUCTION OF 'A � L. C2 <br />THE TRAIL, THE PROPOSED LOCATION MUST BE MARKED IN THE FIELD AND THE WEILAND BIOLOGIST MUST APPROVE ALL TREES TO BE REMOVED FROM THE SECTION TEMPORARY DITCH <br />- EQUIPMENT MAINTANCE SHALL NOT OCCUR IN OR ADJACENT TO WETLANDS AND APPROVED BY THE PLANNING DEPARTMENT. ALL DISTURBED VEGETATION ALONG WETLANDS AND BUFFER MITIGATION AREAS AND DIRECT THE PLACEMENT OF DOWNED SCALE: NONE <br />BUFFERS. (SERA WATER, EARTH AND PLANT AND ANIMAL POLICIES) A 9 OF 8 THE EDGE OF THE TRAIL SHALL BE REPLACED. TREES TO REMAIN ON SITE. A( <br />16 X <br />