My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10305 7TH AVE SE 2016-01-01 MF Import
>
Address Records
>
7TH AVE SE
>
10305
>
10305 7TH AVE SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 12:31:59 PM
Creation date
4/3/2017 12:31:50 PM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
10305
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�t � <br /> .}!�'0=�-._,o.�,�. <br /> Duct Testing Calcu/otor (New Construction) <br /> House address or lot #: D V� E �ve{-e <br /> Conditioned Floor Area: a �" . ,3 <br /> Duct tester location: ` <br /> iti <br /> Pressure tap location: � n � <br /> Ring (if applicable): Open O 1 O ❑ 3 ❑ <br /> At Rough-In or Post Construction <br /> Calculated Test' <br /> Test Methed Standardl Target CFMZS <br /> Air Handler Present (�eakage � q CFM25 per 100 sf of CFA / }n(� <br /> to Extcrior or iocal LeakageJ ( O�' �� V <br /> Air Handler not Present � 3 CFMZS per 100 sf of CFA <br /> (Leakagc co Exterlor or Total leakage) <br /> 1. Test CFM25 must be equal to or less than the calculated target. <br /> Air leakaqe testing Calcu/ator (Blower poor TestJ <br /> Conditioned Floor Area: a S � 3 Calculated Volume (cubic feet) <br /> Ceiling Hieght (ft) � g'' fl a p, ��/ <br /> Standard Tested CFMSo Calculated Test <br /> ��y� Result (ACHso) <br /> <_S.OACHSp (CFMSoX i3yox �os �D�`/!lD�Z-O� SB`1= 3.q ( 3 . �/Sb <br /> GO'conditioned Volumc� <br /> Glosscrry <br /> Rough-In: After installation of the complete air distribution system but before installation of insulation and <br /> sheet rock. Allows for access to all duct seams and connections for rz-evaluation of seal integrity if standard <br /> is not met in intitial test. <br /> Post Construction: At or near final inspection. The home must be complete enough tn pressurize the home <br /> to 25 pa. <br /> Total Leakage: Aggregation of the entire systems duct leakage in a duct test. <br /> Leakage to Exterior: Aggregation of all duct system leaks to the exterior of the CFA in a duct test. <br /> Pascal (pa): Unit of pressure <br /> CFA: Conditioned floor area in square feet <br /> CFMzS: Cubic feet per minute of air leakage at 25 pascals of pressure <br /> CFMso: Cubic feet per minute of air leakage at 50 pascals of pressure <br /> Conditioned Volume: Volume of conditioned space (CFA X ceilin� hie�ht) <br /> ACHSo: Air changes per hour at SO pascals of pressure <br /> �/J <br />
The URL can be used to link to this page
Your browser does not support the video tag.