My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10721 7TH AVE SE 2018-01-02 MF Import
>
Address Records
>
7TH AVE SE
>
10721
>
10721 7TH AVE SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2021 2:13:52 PM
Creation date
4/3/2017 12:43:44 PM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
10721
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Application for <br />PUBLIC WORKS PERMIT <br />PUBLIC WORKS DEPARTMENT <br />b200 Cedar Street <br />Everett, WA 98201 259-88_ 1 Q. 1 tggg <br />TYPE OR PRINT ONLY TO POSTING lt/�--� <br />Owner <br />Date <br />Public Works Permit 4 <br />Building Permit F 57l�C/3 <br />Public Works Fee $ W � <br />honk � sbl 118ma 5faS-3y98 <br />Applicant Mailing Address City Zip Phone ^� <br />Describe Proposed Work <br />57283 <br />PROJECT ADDRESS (if known) <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following If applicable: SRCIiG �VEpp4.50 <br />•Property Lines •Outline and dimensions of all existing and proposed structures on the lot •Existing ppa,`sed u{ailie 8 <br />•Centerline of street •Indicate North "Show any proposed grading changes 'Show measurevnts G otlYY96o31 <br />DO NOT WRITE BELOW THIS LINE WHI Cn iov.vv <br />PERMIT CONDITIONS: it 31395 <br />1. All calls for inspection shall be made 24 hours in advance - phone 259-BAUJER 70.00 <br />2. All work shall be performed in accordance with this permit and current Ci TJi-&ret)besi!` and <br />Construction Standards and Specifications. BOND 330.60 <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NGA1TFlER 1=800.424-5555. <br />CHEi< <br />rl OM4154 <br />4. Install an infiltration trench built as per Section 3-2.6.2 and Figure and Table 3-2.2 of the city <br />Stormwater Management Manual (copy's stapled to this permit). The infiltration trench shall <br />no closer than 5 feet to any up slope property line or foundation nor closer than 10 feet to any <br />downsiope property line or foundation. Call Public Works for an inspection prior to covering <br />trenches. <br />Extanple: This structure has approx. Z- ZCtCSSq, Ft. of imprervious roof area. Therefore <br />if a soil class of lomnv sand is asssumed and the infiltration trench is constucted <br />3f1, deep and aft. wide, from table 3-2.2 the trench should be?.O ft. Long. <br />z <br />O <br />V♦ <br />0A <br />0L <br />It is the developers responsibility to identify the soil class in the field and if conditions <br />in the field vary from those in the example - a(liust accordingly using the above <br />mentioned table as aguide. <br />`7 <br />-7--6 --!O <br />FINAL. INSPECTION <br />Date <br />Approved as Constructed <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save harmless <br />the City of Everett from any and all claims for damages, costs, expenses, or <br />causes of action that may arise because of installation and maintenance of <br />the improvement or other right-of-way us reto applied for and further agrees <br />to remplee-fame upon notice from a DIP and IgAplace public property <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br />COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.