Laserfiche WebLink
&12�wlo�lr <br />PUBLIC WORKS PERM BY Date: <br />r_- ;t�;r[li ,;;`: Public Works Permit#: <br />City of EverettP;bblic Works Ctp rtme t <br />320'0' G4dar Stree `� -'i':0 Building Permit #; <br />Eve retti,WA 98201 CTPlanning Reference#: <br />(4 p�) �67-8g 10i11 i-, <br />l nrUGC':1.09 <br />Public Works Fee $. <br />Other $: <br />10/25/2011 <br />PW1110-017 <br />$ 25.00 <br />PAS :J <br />APPLICANT NAME AND ADDRESS: <br />OWNER NAME AND ADDRESS: <br />JONATHAN WAHL <br />SAME <br />11014 7th AVE. S.E. <br />EVERETT WA 98208 <br />PHONE: 3609132391 <br />PHONE: <br />TAX PARCEL ID ff <br />SITE ADDRESS: 11014 7th AVENUE SE <br />DESCRIPTION OF PROPOSED WORK: <br />GRADING - WORK ALREADY STARTED <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications- <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br />4. Grading should be limited to the designated area. <br />5. Restore the first 20 feet from the front property line to grass. <br />6. Wetland/streanT deliniaton and restoration plan is required by the Planning Department in one month to restore <br />the disturbed buffer area. <br />INSPECTION <br />ved as Constructed <br />ACKrIOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of irstallation and maintenance of the improvement <br />or other rig of -way use hereto applied for and further agrees <br />to remov ame upon notice from the City and to replace <br />public perty damaged thereby. <br />of Applicant <br />Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />