Laserfiche WebLink
HRH <br />a�x <br />a F-3 En <br />H zH <br />H:7j <br />H H <br />NH <br />OHO <br />zH <br />yyH <br />rH H <br />o t7 W <br />z r3 rA <br />i-3 O M <br />Mr. John McConaghy <br />April 28, 1989 <br />Excavations should extend laterally beyond the outside of the footings by a distance equal <br />to the depth of structural fill to be placed or by a minimum of 5 feet. Structural fill should <br />be placed in shallow lifts and each lift compacted to at least 95% of maximum dry density, <br />in accordance with ASTM test designation D-1557 (Modified Proctor) <br />Pavement areas should be over -excavated to provide a minimum of two feet of structural <br />fill below the pavement section. An engineering fabric should also be installed below the <br />structural fill if wet weather conditions exist. Depending on the soil conditions at the time <br />the work is being completed and the skill exercised by the contractor, some additional <br />excavation may be required. Some settlement and -pavement cracking should be <br />anticipated over the life of the pavement if the organic soils are not completely removed <br />from the pavement areas. Differential settlements may accur between the area over <br />utility trench backfills and other areas of the pavement. It may be necessary to import pit - <br />run, clean granular soils to use as backfill for the trenches since some of the the on -site <br />soils are wet and may be difficult to compact. <br />Within pavement roadway areas, the trench backfills should be compacted to the relative <br />compaction recommended earlier. <br />—.- Additional Services <br />It is recommended that Terra Associates, Inc. be provided the opportunity for a general <br />review of the final design and specifications in order to determine the earthwork and <br />... foundation recommendations have been properly interpreted and implemented in the <br />design and construction. <br />The analyses and recommendations submitted if' this report are based upon the data <br />obtained from our subsurface exploration on the site. The nature and extent of variations <br />between test locations may not become evident until construction. If variations then <br />F� appear evident, we should be requested to re-evaluate the recommendations presented in <br />this report prior to proceeding with the construction. <br />v y It is also recommended that we be retained to provide geotechnical services during <br />iconstruction. This is to observe compliance with the design concepts, specifications, and <br />recommendations, and to allow changes in the event subsurface conditions differ from <br />[ ! those anticipated prior to the start of construction. We recommend that Terra Associates, <br />Inc. provide consultation and testing during construction to assess conformance with our <br />recommendations. <br />+� We request that a minimum of two working days' notice he given to schedule our service <br />during construction. <br />We recommend that Terra Associates, Inc. provide the following services during <br />construction: <br />(A) Examine all stripped subgrade areas and the proofrolling operations prior <br />to the start of fill placement or earthwork. <br />Proiect No. T-innc <br />