Laserfiche WebLink
INSPECTION REPORT <br />Date r;`/d —7 Permit: <br />Contractor: <br />Owner:Cs�fJLj- <br />Site Address: I G — 7c -_ <br />TYPE OF INSPECTION REQUESTED <br />ELECTRICAL BUILDING MECHANICAL PLUMBING <br />❑:-,,,,..Temp Service ElUFER ground ❑ GroundworklSlab ❑ Groundwork/Slab <br />tVoeCroundwork ❑ Footing ❑ Rough In ❑ Rough In <br />❑ Slab/Conduit ❑ Foundation ❑ Ceiling Grid ❑ Ceiling Grid <br />❑ Rough In ❑ Structural Slab ❑ OK to insulate ❑ OK to insulate <br />❑ Service ❑ Framing ❑ Rooftop Units ❑ Water Service <br />❑G,ounding ❑Insulation ❑ Mechanical Final ❑Medical Gas <br />❑ Ceiling Grid ❑ Drywall Nailing ❑ Plumbing Final <br />❑ Electrical Final ❑ Shear Nailing GAS PIPE <br />SITE WORK ❑ Roof Nailing [-[i Rough In/Service Hot Water Tar-„ <br />Footing drains ❑ Ceiling Grid ❑ Refrigeration ❑ Rough in <br />i.] Roof drains ❑ Building Final ❑ Gas Pipe Final ❑ HWT Final <br />OTH-R OR CONSULTATION: <br />❑A°PROVAL >-<PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br />❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED 1-1[.1 OK FOR C.O. ❑ VIOLATION <br />] 1114ABLETO PERFORM INSPECTION: <br />F1 C,4LL (425) 257.8881 FOR REINSPECTION-24 hour notice required <br />Inspector: <br />—_> Dale: <br />TABAR, INC. <br />