My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11110 7TH AVE SE 2018-01-02 MF Import
>
Address Records
>
7TH AVE SE
>
11110
>
11110 7TH AVE SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 9:27:32 AM
Creation date
4/3/2017 12:53:08 PM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
11110
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i N OHOIf. S H Serving the Public Haalih of snohomi ` m"7 and ifs Incorpordfetl Cities and towns. <br />HEALT►1 <br />DISTRICT <br />Augusl-8_._T99(F <br />John Markezinis <br />9819 State Hwy 532 <br />Stanwood, WA 9802 <br />M. WARD HINDS, A.D., M.P.H. <br />Heallh oil. - <br />Vital Statistics 1206)339-5260 Adminlsltatlon Office (206)33U5210 <br />Clinic Services (20G)339-57.:10 Communily l lealth Divirdon (206) 339 5230 <br />Sanitation Program (206)339-5270 Environniontal Health Drvisiun (206)3395250 <br />RE: Proposed, Jimmy's Pizza & Pasta <br />1110 7th Ave. SE, Everett <br />Dear Mr. Markezinis: <br />Your plans have been reviewed for compliance with the Rules and Regulations of the State Board of Health and <br />with the policies of the Snohomish Health District. With the addition of the following items, the plans are <br />approved. <br />lJ A hardwashing sink is required in the ware washing area. At the corner of the walk-in refrigerator opposite <br />the hot water heater would be acceptable. <br />l> A back flow prevention device is needed for the mop sink faucet. <br />3. Floors to be quarry tile or 12" x 12" pavers; ceiling to be smooth, vinyl covered drop -in tile; walls to be <br />gypsum painted with gloss or semigloss gloss enamel except at the dishwashing station where plastic <br />laminate or fiberglass reinforced polyester panels will be installed floor to ceiling. <br />4. Outside garbage storage Is to be on a paved surface. <br />5. Vents for bathrooms must be exhausted to the outside. <br />Install a water tap to fill glasses at the front waitress station. <br />I recommend that handwashing sinks be supplied with foot, knee or elbow activated controls. <br />If there are any significant changes or additions to your layout or equipment, the Snohomish Health District must <br />be notified. <br />A pre -operational inspection is required prior to opening for business. Please contact the Food Program office <br />about one week in advance to schedule an appointment. This will insure compliance with the Rules and <br />Regulations of the State Board of Health for Food Service Sani tion-(WAC,248-@4� <br />Please contact me if you have any questions. My office 1 mber is 339-5250. <br />Sincerely,f/ <br />Rick Zahalka, R.S. <br />Environmental Health Specialist <br />RZle <br />cc: Snohomish County Building Dept. <br />Main Offices - County Courthouse B riding, First Floor, 3000 Rockefeller Avenue, Everett, WA 98201 <br />
The URL can be used to link to this page
Your browser does not support the video tag.