My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8615 7TH AVE SE 2018-01-02 MF Import
>
Address Records
>
7TH AVE SE
>
8615
>
8615 7TH AVE SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 9:48:53 AM
Creation date
4/3/2017 12:59:09 PM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
8615
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1I <br />r <br />r state and local--includi rezones): Citv of ere Ev4t_A1li_ <br />County Health Deoar+ + 4nnrnval <br />W <br />10. Do you have any plans for future additions, expansion, or further activity related to or <br />�. connected withthis proposal? If yes, explain: YPc F\Pntll l iri'+inn Q noty nhncoh r{ <br />building, new parish center buildin r Y' ` <br />related parking and site development. (See attached Master Plan L- <br />11. Do you know of any plans by others which may affect the property covered �byPyour <br />pr6posz <br />If yes, explain : r l o£ p Prett will reran' A Ai t' <br />along Seventh <br />12. Attach any otter application form that has been completed regarding the proposal; if non <br />has been completed, but is expected to be filed at some future date, describe the nature <br />of such application form: Rpp.' l P ty <br />P m;+ _ annl;n h �i Pqrkina - <br />.�--- <br />I1.. ENVIRO` PIENTAL RIPACTS <br />(Explanations of all "yes and "maybe" answers are required) <br />Yes ?taybe <br />No <br />(1) <br />Earth. J%lill the proposal result in: <br />(a) Unstable earth conditions or in changes in geologic substructures. _ <br />X <br />(b) Disruptions, displacements, compaction or overcovering of the soil? X— <br />(c) Change in topography or ground surface relief features? X <br />— <br />(d) The destruction, covc:ring or modification of any unique geologic — <br />X <br />or physical features? <br />(e)'Any increase in wind or water erosion of soils, either on or <br />y <br />off the site? <br />(f) Changes in deposition or erosion of beach sands, or changes in <br />of <br />siltation, deposition or erosion which may modify the channel <br />any bay, inlet or <br />g <br />a river or stream or the bed of the ocean or <br />— <br />lake? <br />P + i+P PYi ctina <br />Explanation: New bujj�Ltg will cover annroximately 13.2 <br />G m Will be inrornoratPri i rn;Pn+. <br />story reten ' o l yS? <br />(2) <br />Air'. 12ill the proposal result in: <br />(a) Air emissions or deterioration of ambient air quality? _ <br />X <br />(b) The creation of objectionable odors? — <br />— <br />(c) Alteration of air movement, moisture or temperature, or any <br />X <br />change in climate, either locally or regionally? — <br />planation: One story addition produces no emissions and viill net affect existing <br />J <br />air movements. <br />(3) <br />Idater. Will the proposal result ill: <br />(a) Chasers in currents, or the course or direction of water __ <br />fresh waters'. <br />K <br />movements, in either marine or <br />a � <br />L <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.