My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9006 7TH AVE SE 2018-01-02 MF Import
>
Address Records
>
7TH AVE SE
>
9006
>
9006 7TH AVE SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 9:55:06 AM
Creation date
4/3/2017 1:06:31 PM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
9006
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan Check No.: 92/35420 <br />Page Two of Two <br />7. Plan set does not include an electrical plan. Show location of <br />required outlets, switch controlled lighting outlets, exterior switch <br />controlled lighting outlet and required exhaust fan. <br />8. Plans do not include roof framing over bay window. Show size, species <br />and grade of all members. <br />9. Stairs shall be not less than 36" wide. Provide 1 1/2"-2" 0 handrail <br />placed 34" minimum, 38" maximum above tread nosing, return ends or <br />terminate in newel posts or safety terminal. <br />10. Plans do not show construction of typical interior partitions. <br />11. In the one -hour occupancy separation between a Group R, Division 3 and <br />M Occupancy, the separation may be limited to the installation of <br />materials approved for one -hour fire -resistive construction on the <br />garage side. Install 5/8" type 'x' GWB on common wall, ceiling and <br />any wall supporting habitable space above wrap posts and beams. <br />12. Plan set does not include plans for deck. Show footings, posts, beam, <br />deck joists and decking, as well as detailed drawings of guardrail <br />construction drawn to scale in plan view and elevation views. <br />In order for the processing of your application to continue, it will be <br />necessary to provide the Building Department with two complete new sets of <br />drawings reflecting the corrections requested. <br />Upon re -submittal of the drawings, your application will be given priority and <br />plan review will recommence. <br />All required submittals shall be of sufficient detail and contain sufficient <br />information to ensure that the proposed structure will be constructed in <br />compliance with all adopted codes. <br />Sincerely, <br />Jeff Heilman <br />Engineering Technician , <br />JH: cg/bldeo.;a <br />
The URL can be used to link to this page
Your browser does not support the video tag.