Laserfiche WebLink
Date 1-22-92 <br />Application For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />Public Works Permit • _ <br />Bldg Dept s 92 /35420 _ <br />Public Works Fee $ <br />Total Fee <br />Less Appt Fee Paid $ <br />Balance Due 9 <br />Paul Drake 9006 - 7th AVe BE Everett WA 347-1265 <br />Owner Mailing Address City Zip Phone <br />Owner <br />Applicant <br />Mailing <br />City Zip <br />Describe Prnposed Work 2nd story addition over existing garage <br />Project Address (if known) <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following as applicable: <br />• Property Lines <br />• Outline and dimensions of all existing and <br />proposed structures on the lot <br />• Existing and proposed utilities <br />• Centerline of street <br />• Indicate N.11h <br />• Show any proposed grading changes <br />• Shuw measurements <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hrs. in advance - phone 259.8810. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1.800-424-5555. <br />Approved for Construction Date <br />FINAL INSPECTION Date <br />Approved as Constructed <br />PUBLIC WORKS DEPARTMENT <br />wil Ever Cedar Street <br />Everett, WA 98201 <br />Phone: 259.8810 <br />l-zx-SYL <br />ACKNOWLEDGEMENT OF CONDITIONS <br />W <br />H <br />z <br />0 <br />0 <br />an <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less :he City of Everett from any and all claims for damages, costs, <br />expenses. or causes of action that may arise because of installation <br />and maintenance of the improvement or other right-of-way use hereto <br />applied for and further agrees to remove same upon notice from the <br />City and to replace public property damaged the. <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />