Laserfiche WebLink
PERMIT NS,1 DESCRIPTION <br />623 95TH CT SE (PRIVATE <br />C061C-034 NEW HOUSE-BASIC 222 (PLAN C) <br />E1006-163 TEMP POWER <br />E1008-059 WIRE NEW HOUSE <br />U0706-061 NEW HOUSE-BASIC 222 (PLAN C) <br />624 95TH CT SE #21 <br />U0706•075 NEW HOUSE - 3/4 METER <br />E0811-060 WIRE NEW HOUSE <br />C0706-042 NEW HOUSE - DASIC 219 <br />627 95TH CT SE (PRIVATE <br />CO610-033 NEW HOUSE-BASIC 219 (PLAN B) <br />E0808-042 TEMP POWER POLE <br />E1008-060 WIRE NEW HOUSE <br />U0706-058 N[W HOUSE-BASIC 219 (PLAN 5) <br />628 95TH CT SE lf22 <br />U0706-070 NEW HOUSE - 3/4 METER <br />E0811-062 WIRE NEW HOUSE <br />C0706-037 NEW HOUSE - BASIC 218 <br />631 95TH CT SE (PRIVATE <br />C0610-032 NEW HOUSE-BASIC 218 (PLAN A) <br />E1008•061 WIRE NEW HOUSE <br />U0705-009 IRRIGATIGN M�TER (W ILL LATER SERVE THE HOl <br />U0706-052 NEW HOUSE-BASIC 218 (PLAN A) C— - <br />\ <br />632 95TH CT SE #23 <br />U0706-078 NEW HOUSE - 3/4 METER <br />E1008-062 WIRE NEW HUUSE <br />E1007-032 TEh1P POWER FOR NEW HOUSE <br />C0706-031 NENI HOUSE - BASIC 222 <br />Rose Homes (7th Ave Village) Permit Status on: 12/3l2010 <br />FINALED STATUS <br />10/12i10 FINALED <br />7/1/10 FINALED <br />10/6/10 FINALED <br />12/3/10 FINALED <br />2/1/10 FINALED <br />3/29/10 FINALED <br />7/7/10 FINALED <br />10/19/10 FINALED <br />8/11/OS FINALED <br />9/30/10 FINALED <br />12/3/10 FINALED <br />2/1/10 FINALED <br />3/29J10 FINALED <br />5/25/10 FINALED <br />10/19/10 FINALED <br />9/30/10 FINALED <br />5/10/07 FINALED <br />10/6/10 FINALED <br />7/12/10 FINALEU <br />10/19/10 FINALED <br />Page 3 of 3 <br />