Laserfiche WebLink
� <br />PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />� Connect side sewer per City Standard #'s 601, 60.?, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />� Connect rooftop downspouts to the drainage syste r provided for this lot. <br />9. Rooftop runoff must be discharged to a roof downspout �nfiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _ <br />10. A catch basin as per Ciry Standard Plan �402 with a gas trap per Standard Plen #410 is <br />required for the parking area. <br />i t. Remove and replace curb, gutter and sidewc�k as per City of Everett Standard Plan k's 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />12. Install a Type I concrete driveway per City of Everett Standard #307. <br />13. Pave driveway from the front property line out to the street paving. <br />14. Co�tact the _ Water District for connecting provisions for this building's <br />water and sewer services. <br />15. If a sewer nump system is to be installed, the pressure line must discharge into a private <br />manhole, t��en gravity flow across the public right-of-way. <br />16. The contractar rtiust meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />17. A sprinkler system is required for this building in compliance with the rct�uirements of NFDA <br />Standard� 13D. <br />PWC�mments <br />/aLL L-�Ga��'�-R.� r-( �2=� ,!�L �-Zn;y� I=C��a�D�T7c.� <br />5 r OE'�.t'/-1LK, L��l �'�<<,<<•� �.-r�GL �3C H+-LJ�,c��� i0 /�-N . <br />f}-�r?,��,�-�J ,�7r�2i1�:�7��J �i� /�o �t�-5�c�'✓C� CF/%%�71%/�G <br />� <br />C �1 -i-�u n�L�/LC1/�l/Lj ,C.c,� � , <br />Lo -r- 1 <br />�9 y3 5�-� �e-�. s� �� � � <br />