Laserfiche WebLink
TO BE COMPLETED BY kPPLICANT EVALUATION FOB 1 <br />AGENCY USE ONLY <br />c. Is the site pan of a migration route? If so. explain. <br />kJO <br />d. Proposed measures to preserve or enhance wildlife, if any: <br />ADO <br />6. Energy and Natural Resources <br />a. What kinds of energy (electric, natural gas, oil. wood stove, solar) will be used to meet <br />the completed Project's energy needs? Describe whether it will be used for heating, manu. <br />facturing, etc. <br />poet Air Aft%l <br />b. Would your project affect the potential use of solar energy by adjacent properties? If so. <br />generally describe. <br />00 <br />c. What kinds of energy conservation features are included in tt:e plans of this proposal? <br />List other proposed measures to reduce or control energy impacts. if any: <br />DOES AOr "PLY <br />7. EnTitvusautal Health <br />a. Are there any environmental health hazards. including exposure to toxic chemicals, risk <br />of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? <br />If so, describe. <br />I) Describe special emergency services that might be required. <br />/ems A or AP/r y <br />2) Proposed measures to reduce or control environmental health hazards, if any: <br />DOES A.er #wi,y <br />b. Noise <br />I) What types of noise exist in the area which may affect your project (for example: <br />traffic. equipment. operation, other)? <br />/JOE.s star frpvy <br />2) What types and levels of noise would be created by or associated with the project on a <br />Short—term or a long—term basis (for example: traffic, construction, operation, other)? Indi. <br />rate what hours noise would comt from the site. <br />SItoiZT 7R/h nt%jk. 2oMaa or Dazu rime i <br />I <br />6. I <br />