Laserfiche WebLink
TO BE COMPLE'M BY APPLICANT <br />g. Proposed measures, <br />w reduce or control transportation impacts. if any: <br />cress AA-r Amy <br />IS. Public Services <br />a. Would the project result in an increased need for public services (for example: fire pro- <br />tection. police protection, health care, schools, Other)? If so, generally describe. <br />Ar0 <br />b. Propcsed measures to reduce or control direct impacts on public services. if any. <br />A✓0 <br />16. Utilities <br />a. Circle utilities currently available at the site: Eectricit natural(ggs. west refuse serv- <br />ice, oleohoae sant�ptic system, other. <br />b. Describe the utilities that are proposed for the project. the utility providing the service. <br />and the general construction activities on the site or in the immediate vicinity which might <br />be needed. <br />POSS( ¢Ly tvAfM foe A..) ZAA4G.9yrO■+ sysIEM . <br />C. SIGNATURE <br />The above answers are true and complete to the best of my knowledge. I understand that <br />the lead agency is re% ing on them top make its decision. <br />Signature: ............................ <br />DateSubmitted: .......................................................... <br />9"- <br />EVALUATION POR <br />AGENCY USE ONLY <br />iJ. <br />