Laserfiche WebLink
COST ESTIMATE SHEET <br />Receipt # <br />Cost of Work Order <br />X Cost of Service Order <br />Contact Person Dave Sarretnan <br />Requested By <br />Gordon Witcher <br />Property Owner (name) <br />$3,010.00 <br />Everett Free Methodist <br />Charge Cost to (name if different than owner) Same <br />Address 9506 7th Ave SE <br />Installation Location Same <br />City <br />Everett <br />Public Works Department <br />Utilities Division <br />3200 Cedar Street <br />Everett, Washington 9820.1 <br />(206) 259-€800 <br />Date Paid <br />Work Order # <br />Service Order # <br />telephone # 355-5985 <br />Date of Request 6-1-95 <br />Zip WA <br />Installation type/description/size/etc. Excavate 8" water main, tap and install 3" irrigation meter and restore <br />area. <br />® The following estimate is based upon the Utilities Division providing all labor, equipment, materials, <br />restoration, and final hook-up. <br />❑ The following estimate is based upon the Street Division work group providing all labor, equipment, <br />materials and restoration to property. <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such installation was made and the owner <br />thereof, and provided further, that any excess payment shall be returned to the person applying for the installation. <br />Itemized Cost Estimate: <br />Bldg. Permit Center <br />Clair Olivers <br />Labor & Benefits $780.00 Tom Thetford <br />Material 1,736.00 Don Weitkamp <br />Kirk Brooks <br />Equipment Rental 494.00 Gordon Witcher <br />Dan Lowell <br />Surface Restoration Stan Mitchell <br />TOTAL $3,010.00 Paul McKee <br />Prepared by: Mike Ward Date Est. <br />Accepted by: Prepared: Representing: <br />6-1-95 <br />ESTIMATE JOD FOR 6 MONTHS <br />rsrweN nnenscs T r.wMv <br />