My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9506 7TH AVE SE 2018-01-02 MF Import
>
Address Records
>
7TH AVE SE
>
9506
>
9506 7TH AVE SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2022 10:37:00 AM
Creation date
4/3/2017 1:17:32 PM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
9506
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO MUM- !"R ' 6 10 <br />CLOSED CM WORK ORDERS REPORT V <br />Total Utility Maintenance Management System <br />06/26/1995 Page 1 <br />----------------------------------- -- <br />Date Range :01/09/1989 - 06/26/1995 <br />CM York Order Range :1001091070001 - UT2608- - Pattern :7101196648525 <br />Item Range :<Bl.ank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />------------------------------------------------------------- <br />CM WORK ORDER ID: 7101196648525 Title: SO 2 INCH 9503 3RD AVE SE <br />Item ID: -- <br />Location ID: -- <br />Program 710 Function 119 Activity 664 <br />Date Completed: 06/15/1995 <br />Overall Craft: <br />Issued: 06/07/1995 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID Name <br />----- --------------- <br />UL LMA <br />WST TDE1 <br />Materials: <br />ID <br />------------ <br />BOXO00043547 <br />BOXO00044747 <br />BOXO00056147 <br />CORP38002547 <br />COUP38007347 <br />ELLO38099147 <br />METE38089347 <br />NIPP38134247 <br />PIPE38060947 <br />SADD4601.8647 <br />SETT38033447 <br />VALV38034348 <br />WIRE00119847 <br />LIBBING, <br />THOMPSON, <br />Issued by: WMW Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Planned Hrs Actual Hrs <br />-------------------------------- -- - <br />MAURICE A. 0.00 8.00 <br />DWAYNE E. 0.00 8.00 <br />Total Labor Cost: <br />Cost <br />118.64 <br />130.80 <br />249.44 <br />Description <br />Date <br /># Used <br />Cost <br />------------------------------ <br />BOX VALVE 18" CI TOP&LID ONLY <br />-------- <br />06/15/1995 <br />-------- <br />1 <br />---------- <br />20.28 <br />BOX VALVE PLASTIC BOTTOM ONLY <br />06/15/1995 <br />1 <br />13.40 <br />BOX METER PLA 17" X 30" W/LID <br />06/15/1995 <br />1 <br />73.06 <br />CORP STOP 2" MIP X MIP @ <br />06/15/1995 <br />1 <br />55.78 <br />COUPLING COMP 2" MIP X CTS @ <br />06/15/1995 <br />2 <br />46.22 <br />ELL 1 1/4" 90 DEG WELDING <br />06/15/1995 <br />1 <br />7.49 <br />METER 2" TRIDENT T-10 <br />06/15/1995 <br />1 <br />276.48 <br />NIPPLE 2" X 4" BRASS <br />06/15/1995 <br />1 <br />4.59 <br />PIPE 2" POLY C.T.S. <br />06/15/1995 <br />43 <br />44.72 <br />SERVICE SADDLE 8" W/2" IP DBL <br />06/15/1995 <br />1 <br />23.04 <br />SETTER CUST 2" LENGTH 12"X 17" <br />06/15/1995 <br />1 <br />276.39 <br />VALVE GATE 2" SUPER HEAVY DUTY <br />06/15/1995 <br />1 <br />87.29 <br />TRACING WIRE 10 GAUGE <br />06/15/1995 <br />45 <br />4.50 <br />Total Material Cost: 933.24 <br />Vehicles: <br />ID Description Hours Cost <br />------------ ------------------------------ ---------------- <br />V2146 87 CHEV 1 TON W/H1'D. UNIT 8.00 40.80 <br />Total Vehicle Cost: 40.80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.