Laserfiche WebLink
IC91971D <br />JOR OCT B 1979 <br />0 <br />BECnWI i AR• hlrIElCTS & DAVIS <br />CDrISULTING ENGINEERS; CIVIL AND STRUCTURAL <br />October 4, 1979 <br />BSD Architects <br />14219 Lakehills Blvd. <br />Bellevue, WA 98007 <br />ATTENTION: Jim Davis, AIA <br />Dear Jim: <br />RE: Everett Free Methodist Church <br />Mechanical Duct - Floor Truss Interference <br />Per or phneesigned <br />coup <br />flooruintootheconvesationwallrbetweenathechanical corridorduct is 206 anddbeginnersoroom 205 andu the <br />corridor 206 and nursery 207. This penetration will occur in five place,. <br />This duct location interfers with one floor truss. This truss will have to <br />be cut to allow the mechanical system to `unction. <br />The truss supplier shop drawing indicates four additional <br />t trusses <br />aorla total <br />of five trusses in the area of the partition above, plus <br />center adjacent under the corridor. The flour sheathing will act as a <br />longitudinal load distributor between the 4 remaining trusses and adjacent <br />trusses. However, the remaining 4 trusses are adequate to take the load of <br />the partition above. <br />herefore,I accommodate the nomstructural <br />systemrdy �n cutting one truss in this area <br />to <br />cal <br />If you have any questions please -:a11. <br />Si cer ly, <br />upe t, E <br />J R:jfr <br />Suite 103' 34-37th Street N.E <br />rJ <br />P.O. Box 836 ;Auburn. Wa 98002 7776 <br />Auburn. Wa 98002 i 206-a33- <br />