My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9915 7TH AVE SE 2018-01-02 MF Import
>
Address Records
>
7TH AVE SE
>
9915
>
9915 7TH AVE SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 10:52:55 AM
Creation date
4/3/2017 1:24:48 PM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
9915
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. <br />5. <br />6. <br />� <br />i 3LIC WORKS PERMIT COMME� <br />Connect side sewer per City Standard #601. <br />Connect side sewer per City Standard #'s 601, 602, 604. <br />Connect all rooftop downspouts to the side sewer. <br />Connect rooftop downspouts to the drainage system provided for this loi. <br />8. Rooftop runoff must be discharged lo a roof downspout infiltration system per City of Everett Storm <br />Manual 3-2.62. The approximate size trench is 3.5' wide, 2' deep and 25' long. See attar,hment (or <br />more details. <br />The contractor must meet with the Public Works I�spector to discuss potential drainage routing prior to <br />beginning the project. <br />Install erosion control measures as determined by the Public Works insper,tor, sucli as silt fence, siraw <br />bales, swales, or erosion blarikets. <br />Install erosion control measures per City of Everett Standards for smail parcels <br />Remove erosion control measures upon completion of the project prior to final approval of the permit. <br />All excavaled malerial from foundation, sidewalk and driveways sha.i be hauled to an approved, <br />permilted site. No wasling of malerial is allowed on this building lol. <br />No dirt, mud, rocks or debris to be tracked onto roadway. <br />15. No buildinc� materials to be stacked on sidewalks and sidewalks lo be kept clean and open for <br />pedestrian lravel. <br />16. <br />17. <br />1 E. <br />19. <br />20. <br />21. <br />?.2. <br />23. <br />Adjust water meter box 1" above sidev�alk grade. <br />Remove and replace curb, gutter anti sidewalk as per Cily of Everett Standard Plan tt's 305A & 306 on <br />this proposal's frontaye as direcled by the Public Works Inspeclor (i.e. all unused driveways and any <br />broken or damac�ed area must be repiaced). <br />Inslall a Type I concrete driveway per City of Everett Standard #307. <br />Pave driveway irom the front property line out to the street paving. <br />Contact the Water Dislrict for connecting provisions for this building's water and <br />sewer services. <br />A catch basin as per Cily Standard Plan #402 with a gas trap per Standard Plan #410 is required for the <br />parking area. <br />IF a sewer pump system is to be instailed, the pressure line must discharge into a private manhole, then <br />gravily flow across the public right-of-way. <br />A sprinkler system is required for this building in compliance with ihe requirements of NFDA Standards <br />13D. <br />FOR PUBLIC 1NORK5 INSPECTION, CA.LL RANDY AT 425-339-7403 / CLIFF AT 425339-7404 <br />PWComments <br />��a <br />
The URL can be used to link to this page
Your browser does not support the video tag.