Laserfiche WebLink
CLOSED CM WORR ORDER6 REPORT <br />Total Utility Maintenance Management System <br />08/28/1995 Page 1 <br />Date Range :O1/09/1989 - 08/23/1995 <br />CM Work Order Range :1001091070001 - UT2608- - Pattern :71011967503�5 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />_______________________________________________________________________ <br />CM WORK ORDER ID: 7101i96750335 Ti.tle: REPAIR 8823 7TH AVE �,'J <br />«DTJPiICATE PRINTING OF THIS WORK ORDER» <br />Ite:� ZD: WS1885F003 -- WATER SERVICE <br />Locat,ion ID: -- <br />Prog:cam 710 Function 119 Activity 675 <br />Date Completed: C8/21/1995 <br />Overall Craft: <br />Issued: 08/16/1995 Issued by: A'MW �ssigned to: <br />Out of Service? 1�0 Priority: Travel Time: 0.00 Iir. <br />Meter Reading: <br />Downtime: 0 hour� <br />Status: <br />Labor: <br />Craft ]:G Name Planned Hrs Actual Hrs <br />----- ------ --------•---------------------- ----------- ----- <br />UL SSJ S:�:ITH, STEVE J. 0.00 1.00 <br />Materials: <br />ID <br />ADAP34000547 <br />ADAP34000647 <br />COUP34142747 <br />ELL034104247 <br />METE360R9447 <br />PIPE34060647 <br />VALV34008348 <br />Vehicles: <br />ID <br />Description <br />ADAPTER 3/4" MIP X INSTA-TITEC <br />ADAPTER 3/4" FIP X INSTA-TITE@ <br />COUPLING 3/4" CTS COMP X MIPT@ <br />ELL 3/4" STREET BRASS <br />METER 5/8" X 3j4" P�EPTUNE T-10 <br />PIPE 3/4" POLY I.P.S. <br />VALVE METER 3/4" LOCK W'tNG IP� <br />Description <br />Total Labor Cost <br />Date <br />OS/16/1995 <br />08/16/1995 <br />08/16/1995 <br />08/16/1995 <br />08/16/1995 <br />08/16f 1995 <br />08/16/1995 <br />Cost___ <br />15. 0:; <br />15.03 <br />�, Used Cost <br />-------- ---------- <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Total l�iaterial Cost: <br />Hours Cost <br />------------ ---------------`-----�------ <br />-- ------ ---- <br />V2117 91 CHEV 1-TON H:D UNIi' 1.00 ______5_60 <br />Total Vehicle Cost: 5.60 <br />Work Description: <br />-------------------•--•--------------------------------------- <br />METER�' 40G35842 <br />ToLal cost for work ��rder 7101196750335: <br />7.80 <br />7.23 <br />5.08 <br />1.74 <br />30.98 <br />0.26 <br />8.46 <br />61.55 <br />� <br />� <br />