Laserfiche WebLink
Arlee Barker <br />January 24, 1997 <br />Plan Check #53978 <br />Page 2 of 2 <br />Prepare a response letter showing where each item in this correction letter is addressed on the plan set. <br />Upon resubmittal of the application and site plans, your application will U�° given priority and plan <br />review will commence. <br />All required submittals shall be of sufficient detail and contain sufficient information to ensure that the <br />proposed structure will be constructed in compliance with all adopted codes. <br />Sincerely, <br />JeEFHeilman <br />Development Technician <br />Jl l: jcVl-971t rs.d oc(p3-1) <br />