My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5810 8TH AVE W 2016-01-01 MF Import
>
Address Records
>
8TH AVE W
>
5810
>
5810 8TH AVE W 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2017 12:13:48 AM
Creation date
4/3/2017 1:44:14 PM
Metadata
Fields
Template:
Address Document
Street Name
8TH AVE W
Street Number
5810
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/; �. <br />(_�i L� %�GJO;� j� !�; �/ %� c�—C� <br />PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved pian dated _ <br />� Connect side se�.ver per Ciry Standard #601. <br />6. Connect �'�e s�wer per City Standard tt's o01, 602, aoa. <br />7. Connect all rooftop down�pouts to the side sewer. <br />� 8 Connect rooftep downspouts to the drainage system provided for fiis lot. <br />9. Rooftop rur�off must be dischargea to a roof downspout infiltration system ae; City of Everett <br />Storm Mzr.ual 3-2.6.2. Width _, Depth _, Length _. <br />10. The contractor must meet with the Public Works Inspector to discuss petential drainaae <br />_ routing prior to beginning the project. � <br />� 11. Install erosion control measures as determined by the Public Works inspector, such as �ilt <br />fence, straw bales, swales, or erosion biankets. <br />12. Install erosion control measures per City of �verett Standards for small parcels <br />;13J Remove erosion control measures upon completion of the project prior to final approval oi the <br />" permit. <br />14 All excavated material from foundation, sidewalk and driveways sliall be hauled to an <br />approved, permitted site. No wasting of ma:erial is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan ;='s 305A <br />& 306 on this proposzl's frontage as directed by the Public Works Inspector ji.e. all unuszd <br />driveways and any broken or damaged area must be replaced). <br />16. Insiall a?ype I concrete driveway per City of Everatt Standard n307. <br />i'. Fave driveway ;rom the tront praperty line out to the street paving. <br />� 8. Contact the Water Dis,rict f�r connecting provisions tcr this building's <br />water ar.d sewer ser.�ices. <br />? 9. P. catch basin as per City Standaro ?Iar =-0� �,vith a ga; trae per Standard r^!an =»10 is <br />required �or the parking area. <br />20. If a sewer pumo system �s ;o be installed, tne pressure line must discharge into a private <br />mannole, then graviiy flow across the public right-o;-vday. <br />�%�': A sprinkler system is required fer this buildina in compliance �:vi�r :he recuirements or NFDA <br />— Standards 1�D. <br />� „ l i. . ..t - r 7 i,-', <br />i` /�.i'�'r-_/�,1 .�.� Y � i /. /;j � <br />/ �. �' � <br />
The URL can be used to link to this page
Your browser does not support the video tag.