Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan d4ted <br />5. Connect side sewer per City Standard #601. <br />� <br />� 6. � Connect side sewer per City Standard n's 601, 602, 604. <br />7. Connect all rcoftop downspouts to the side sewer. <br />� 8.>Connect roo:'op downspo�rts to the drainage system provided for this lot. <br />9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _. <br />10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />11 �nstall erosion control measures as determined by the Public Works inspector, such as silt <br />"� fence, straw bales, swales, or erosion blankets. <br />12. Install erosion control measures per City of Everett Standards for small parcels <br />-'� <br />13..Remove erosion control measures upon completion of the project prior to final approval oi the <br />��' permit. <br />14 �All excavated material from foundation, sidewalk and drivaways shall be hauled to an <br />" approved, permitted site. No wasting of material is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Evarett Standard Plan n's 305� <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. Install a Type I concrete driveway per City of Everett Standard n307. <br />1'. Pave driveway irom the front property line out to the street paving. <br />18. Gontar,t the Water District for connecling provisions for this building's <br />water and sewer services. <br />19. A catch basin as per City Standard Plan n4G2 with a gas trap per Standard Plan n410 is <br />required for the parking area. <br />20. If a sewer oump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />?lvComments <br />2IZ_ <br />