Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br />-.. .�s ;:er ?ubi�c Works approved plan dated _ <br />.' �� <br />'�, Ccnnect side sewer per City Standard a601. <br />�i <br />o Ccnnect side se�ver per Ciry Standarc, z'S bOl , b'O" OO». <br />; Connect all rooftop downspouts to the side se�ver. <br />I 8./ Connec; rooftop downspouts to the drainage sys�em prov�ded for ;his ic�. <br />\./ <br />P. Rooftop runoH must be discharqed to a rooi downspout in(iltration system per City of EvFrett <br />Storm tvlanual 3-2.6.2. vVidth _, Depth _, Length _. <br />' 0. The contractor must meet with the Public Works Inspecior to discuss potential drainage <br />routing prior to bsginning the proj2ct. <br />11.Ilnstall erosion control rneasures as determine:! b� the ?ub!ic'!Jorks inspector, sucn as silt <br />—� fence, straw bales, sv+ales, or eros�on blankets. <br />'2. Instalt erosion control measures per City o( Evere:: S:an��r�s'or sm�ll ;;arce!� <br />?3. Remor•e erosion controt measures upon completion of the project prior to finai approval of the <br />permit. <br />' 4. All ezcavated material from foundation, sidetivalk and driveways shall be hauled tu an <br />approved, permitted site. No wasting of materiai is allor+ed on this building lot. <br />_�.emove and replace curb, gutter and sidewalk as per City o! Everett Standard P!ar :'s 30��. <br />8 300 on ihis proposal's ironiage as directed by the Public Works Insp�ctor (i.e. all un�s�d <br />driveways and any broken or damaged area must be replaced). <br />' S. Ir.stail a Type I concrete driveway pzr City of Everen Standard »307. <br />'%. Pave drivevray from the front prcperty line out to the street paving. <br />8. Contact the Water District (or connecting provisions (or this building's <br />water and sewer services. <br />A catch basin as per Ciry Standard Plan «402 with a gas trap per Standard Plan »a 1 C is <br />reauired tor the parking area. <br />_, is a sewer pump system �s to bz installed, the pressure line must discharge into a orivate <br />manhole, then gravity flow across the public right•r,f-way. <br />_' A s�rinkl �r system is �equired for ,his building in compliance with the requirements of NFDA <br />�t�'... ., '?u. <br />