My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5910 8TH AVE W 2016-01-01 MF Import
>
Address Records
>
8TH AVE W
>
5910
>
5910 8TH AVE W 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2017 12:05:39 AM
Creation date
4/3/2017 1:47:06 PM
Metadata
Fields
Template:
Address Document
Street Name
8TH AVE W
Street Number
5910
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�LE��v�v�01� �i >> G=� <br />PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated _ <br />(l �. / Cornect side sewer per City Standard #601. <br />L� <br />6. Conneci side sewer per Ciry Standard r's 601, 602, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />�� Connect ron�op downspouts to the drainage system provided for this lot. <br />°. Rooftop runofi must be discharged to a roof dovdnspout infiltraiion sysiem per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _. <br />10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing Frior to beginning the project. <br />�� <br />,1. Install erosion control measures as deterrr,ined by the Public Works inspector, such as silt <br />fence, straw bales, swales, or erosion blankets. <br />� 2. Instail erosion control measures per Ciry ot Everett Standards for small parcels <br />� 3� Remove erosion control measures upon completion of the project prior to final approval of the <br />� permit. <br />14. All excavated material from foundation, sidewalk and driveways snall be hzuled to an <br />approved, permitted site. No wasting of material is allowed oh this building lot. <br />15. Remove zrd replace curb, gutter and sidewalk as per City of Everet; Standard Plan n's 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspecior (i.e. all unused <br />driveways and any broicen or damaged area must be replaced). <br />16. Install a Ty�e f concrete driveway per City of Everett Standard n347. <br />17. Pave driveway from the iront propery fine out to the street paving. <br />i�. Contact !he Water District tor connectin <br />water and szwer sErvices. 9 Prcvisions for this huilding's <br />19. .4 ca,ch basir as per City Standard Plen =402 svith a gas ,rao per Standard Plan n410 is <br />reauired for ihe parking area. <br />2G. ii � s2wer pumo system �s to be inscalled, the pressure line must discharge into a private <br />manhole, th=n gravibj `low across the public right-ot-way. <br />��2'< A;prinkl=_r system is reouired for this building �n compliance �.�✓ith ;he requirements oi NFDA <br />' � Standards 13D. <br />1t ii;i; /;j /i.� .�^-ft. % � / �:/ /� /� <br />�. � � . � <br />i <br />" ,�amcen., <br />L�Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.